My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9615 HOLLY DR 2020-10-22
>
Address Records
>
HOLLY DR
>
9615
>
9615 HOLLY DR 2020-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 9:09:18 AM
Creation date
11/17/2017 1:33:36 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9615
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reid Patterson <br /> From: Peter Kanyer <br /> Sent: Friday, September 16, 2016 3:26 PM <br /> To: Reid Patterson <br /> Cc: Dennis Titus <br /> Subject: FW: RFI#4 clarification requested <br /> Reid, <br /> Please see the response from Structural below. Please let us know if you have any questions. <br /> Regards, <br /> n + 0 <br /> Pete Kanyet,AtA,Lap AP <br /> Project Metet <br /> 502 W Rrrer ide,suite 200 <br /> Sz,Qkane WA 99201 USA <br /> (509)3a 646 <br /> From: Dennis Titus [mailto:DennisT©cgengineering.com] <br /> Sent: Friday, September 16, 2016 3:29 PM <br /> To: Peter Kanyer <br /> Subject: RE: RFI #4 clarification requested <br /> Peter, <br /> It is acceptable to drill through the BC8 to install the HUC. I prefer not to shrink the beams. <br /> .,. ,.... > Dennis Titus,PE,SE I Structural Engineer <br /> 250 4th Ave S Ste 200,Edmonds,WA 98020 <br /> p.425.778.8500 I f.425.778.5536 <br /> www.cgengineering.com/ <br /> From: Peter Kanyer[mailto:kanyer@nystromolson.comj <br /> Sent: Friday,September 16,2016 9:41 AM <br /> To: Dennis Titus<DennisT@cgengineering.com> <br /> Subject: FW: RFI#4 clarification requested <br /> Dennis, <br />
The URL can be used to link to this page
Your browser does not support the video tag.