Laserfiche WebLink
Project: WFP Operations Building Seismic Retrofit -Rebid <br /> Change Order No.002 <br /> Change Order Effective Date: 9/15/17 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this <br /> Change Order,the work described in Exhibit A,and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation,delay,impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute,claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest,dispute,claim,or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> r, , / , , <br /> Ma • City Clerka9 �l City Atto jers <br /> Date: Q Z.��"a0i Date: — /l <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Direc • <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> ._�. % r ,/ �. <br /> Date: 9 7 Date: • 7 A"Date: 2/ // Date: r �x <br /> WFP Operations Building Seismic Retrofit-Rebid Septe .er 15,2017 <br /> WO#UP3600 006363 -2 <br />