Laserfiche WebLink
• <br /> Project: WFP Operations Building Seismic Retrofit-Rebid <br /> Change Order No.002 <br /> Change Order Effective Date: 9/15/17 <br /> change directive 003 have been deducted from the total costs of work change directive <br /> 014. <br /> Contract Time: <br /> Thirteen, (13) Working Days are being added to the contract by change order#2. <br /> END DOCUMENT 006363 <br /> WFP Operations Building Seismic Retrofit-Rebid September 15,2017 <br /> WO#UP3600 006363 -5 <br />