Laserfiche WebLink
Exhibit B <br /> Lake Chaplain Road Culvert and Embankment Replacement <br /> Total Estimated Fee <br /> Consultation Additional Project <br /> regarding Site Visits Coordination <br /> streambed, during <br /> slopes,MSE Construction <br /> walls <br /> Approx. <br /> Position Classification Total Hours Rate Totals <br /> Principal 0 x $70.00 = $0 <br /> Associate-Geotechnical 6 10 2 18 x $59.48 = 1,071 <br /> Hydrologist/Hydraulic Engineer 0 x $42.00 = 0 <br /> Associate-Biologist 2 2 x $66.00 = 132 <br /> Environmental/Permitting 6 4 2 12 x $40.00 = 480 <br /> Staff 3 Engineer 0 x $35.00 = 0 <br /> Staff 3 Biologist 12 12 x $35.00 = 420 <br /> CAD Designer 0 x $42.00 = 0 <br /> Admin 2 4 4 x $29.00 = 116 <br /> Admin 1 0 x $22.00 = 0 <br /> Hours Per Task 14 26 8 0 0 0 0 48 <br /> Direct Cost Per Task 729 1175 315 0 0 0 0 = $2,219 <br /> Overhead Per Task 1554 2505 671 0 0 0 0 OVERHEAD @ 213.19% $4,730 <br /> Profit Per Task 219 352 94 0 0 0 0 Profit @ 30.00% $666 <br /> Task Totals 2501.44 4031.80 1080.91 0.00 0.00 0.00 0.00 <br /> Reimbursables: <br /> $0 <br /> 0 <br /> Mileage,Plans Production <br /> and Expenses 300 300 <br /> Subconsultants: <br /> Subtotal Reimbursables and Subconsultants: $300 <br /> Total Estimate: $7.914 <br />