My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers Inc 11/6/2017 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2020
>
GeoEngineers Inc 11/6/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2017 11:14:42 AM
Creation date
12/7/2017 11:14:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers Inc
Approval Date
11/6/2017
End Date
12/31/2020
Department
Facilities
Department Project Manager
Mike Palacios
Subject / Project Title
Environmental Consulting Smith Street Mill
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$171,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 5 <br /> 2. Cost Estimate (Time and Materials): <br /> Description Estimate <br /> Professional Labor <br /> RI Work Plan and VCP Application and Project Kickoff $14,038 <br /> Remedial Investigation Field Explorations $8,864 <br /> Groundwater sampling and well surveying $7,852 <br /> Remedial Investigation and Feasibility Study(RI/FS) Report $27,429 <br /> Cleanup Action Plan (CAP) $10,267 <br /> VCP Meetings,Communication and Project Coordination $17,889 <br /> Subtotal Labor Estimate $86,338 <br /> ROM Remedial Cost Estimate and TEE(Lump Sum) $6,000 <br /> Reimbursables <br /> GeoEngineers Equipment and Mileage $2,020 <br /> Subcontracted Utility Locate and Drilling $16,618 <br /> Subcontracted Chemical Analysis(Estimated Placeholder) $27,025 <br /> Subtotal Reimbursables $45,662 <br /> 25%Contingency $33,000 <br /> Grant Total $171,000 <br /> 3. Change Order/Changes (To be completed, initialed and dated by Project Engineer and <br /> GeoEngineers prior to work being performed) <br /> 4. Schedule: We anticipate the services outlined under this scope of work will extend over <br /> approximately 22 months from authorization to completion of the draft CAP submittal. <br /> 5. Terms and conditions and hourly billing rates are included as Exhibit B. <br /> 6. Accepted:, .44,1/64.44/14(A---- <br /> City of 41 rett GeoEngineers by Dana Carlisle, Principal <br /> 11'4""arb/V— 10/30/17 <br /> Date Date <br /> A ROVED TO 0 M <br /> JAMES D.ILES,City Attorney <br /> AT; T. /�• <br /> _, .J <br /> City Clerk <br /> GeoEngineers,Inc. <br /> H2'100661408-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.