Laserfiche WebLink
Page 5 of 5 <br /> 2. Cost Estimate (Time and Materials): <br /> Description Estimate <br /> Professional Labor <br /> RI Work Plan and VCP Application and Project Kickoff $14,038 <br /> Remedial Investigation Field Explorations $8,864 <br /> Groundwater sampling and well surveying $7,852 <br /> Remedial Investigation and Feasibility Study(RI/FS) Report $27,429 <br /> Cleanup Action Plan (CAP) $10,267 <br /> VCP Meetings,Communication and Project Coordination $17,889 <br /> Subtotal Labor Estimate $86,338 <br /> ROM Remedial Cost Estimate and TEE(Lump Sum) $6,000 <br /> Reimbursables <br /> GeoEngineers Equipment and Mileage $2,020 <br /> Subcontracted Utility Locate and Drilling $16,618 <br /> Subcontracted Chemical Analysis(Estimated Placeholder) $27,025 <br /> Subtotal Reimbursables $45,662 <br /> 25%Contingency $33,000 <br /> Grant Total $171,000 <br /> 3. Change Order/Changes (To be completed, initialed and dated by Project Engineer and <br /> GeoEngineers prior to work being performed) <br /> 4. Schedule: We anticipate the services outlined under this scope of work will extend over <br /> approximately 22 months from authorization to completion of the draft CAP submittal. <br /> 5. Terms and conditions and hourly billing rates are included as Exhibit B. <br /> 6. Accepted:, .44,1/64.44/14(A---- <br /> City of 41 rett GeoEngineers by Dana Carlisle, Principal <br /> 11'4""arb/V— 10/30/17 <br /> Date Date <br /> A ROVED TO 0 M <br /> JAMES D.ILES,City Attorney <br /> AT; T. /�• <br /> _, .J <br /> City Clerk <br /> GeoEngineers,Inc. <br /> H2'100661408-02 <br />