My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers Inc 11/6/2017 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2020
>
GeoEngineers Inc 11/6/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2017 11:14:42 AM
Creation date
12/7/2017 11:14:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers Inc
Approval Date
11/6/2017
End Date
12/31/2020
Department
Facilities
Department Project Manager
Mike Palacios
Subject / Project Title
Environmental Consulting Smith Street Mill
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$171,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br /> REIMBURSABLE EXPENSES <br /> Type of Expense Maximum Per Item Cumulative Maximum <br /> Parking NA <br /> Meals NA <br /> Environmental Exploration <br /> Equipment $150/day <br /> Peristaltic Pump $50/day <br /> Electrical Tape $25/day <br /> Estimated reimbursable expenses for subcontracted drilling, <br /> utility locate, and chemical analysis are shown in Exhibit A. <br /> Charges for subcontracted services are cost plus 15 percent. <br /> Refer to Schedule of Charges-2017 which is attached and <br /> forms a part of this agreement for additional unit rates for <br /> Equipment. Mileage to be billed at IRS mileage rates. <br /> GeoEngineers, Inc. <br /> File No.0661-108-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.