<br />  									ORDINANCE NO.  /1`73
<br />       						AN   ORDINANCE   amending   Ordinance   No.   1388-87   which
<br />       						created  a  special  fund  entitled  "Hewitt,   Oakes,   and
<br />       						Lombard   Railroad   Bridge   Replacement",   Fund   391   to
<br />       						accumulate     all     the     design,      right-of-way     and
<br />       						construction  costs  for  the  Hewitt,  Oakes,  and  Lombard
<br />       						Bridge  Replacement  project,  including  bridge  approach
<br />       						work and utility  replacement  work.
<br />     				WHEREAS,   on  March  2,   1984,   the   City   of   Everett   entered   an   emergency
<br />     			agreement    with   the   consulting   engineering    firm   of    Harold    Sargent    and
<br />     			Associates  to  perform  structural  analysis  and  load  rating  for  several  bridges,
<br />     			including  Oakes  Street  Bridge  and  Hewitt  Avenue  Bridge,  for  a  total  amount  of
<br />     			$7,500;  and
<br />     				WHEREAS,  on  April  18,  1984,  the  City  of  Everett  authorized  a  supplemental
<br />     			agreement  with  Harold  Sargent  and  Associates  to  provide  additional  services,
<br />     			including  load  ratings  on  Lombard  and  tunnel  investigations,  for  a  total  fee
<br />     			of $18,300;  and
<br />     				WHEREAS,   the  final  Bridge  Rating/Load  Rating  Analysis,   as  performed  by
<br />     			Harold   Sargent,   indicated   that   the   three   (3)   bridges   in   question   have,
<br />     			practically  speaking,  reached the end of  their useful lifespan;  and
<br />      				WHEREAS,    on    October   30,    1985,    Ordinance    1811-85,    titled    "Traffic
<br />     			Engineering   Improvements"   was  passed  which  repealed  Ordinance   1036-84,   and
<br />     			budgeted preliminary engineering in the  following  programs:
<br />      				Fund 368,  Program 291,  Lombard Bridge Replacement,  $50,000
<br />      				Fund  368,  Program 297,  Hewitt Bridge Replacement,  $100,000
<br />      				Fund 368,  Program 298,  Oakes Bridge Replacement,  $50,000;  and
<br />      				WHEREAS,  on  June  2,  1987,  the  City  of  Everett  entered  an  agreement  with
<br />     			INCA  ENGINEERS,  INC. ,  to  provide  Preliminary  Engineering  for  the  replacement
<br />     			of the  Hewitt,  Oakes,  and  Lombard  Bridges  under  a  single  contract,  since  there
<br />     			is  considerable  economy  in  performing  the  engineering  services  as  a  single
<br />     			contract  with one  consulting  engineering  firm;  and
<br />      				WHEREAS,  it  is  anticipated  at  this  time  that  there  will  be  considerable
<br />     			economy  in  having  the  construction  phase  of  the  Hewitt,   Oakes,   and  Lombard
<br />     			Bridges  performed  under  a  single  construction  contract  by  a  single  contractor;