My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/01/27 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/01/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 10:17:23 AM
Creation date
3/9/2016 10:17:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) <br /> Geotechnical Engineer Services <br /> 1. HWA GeoSciences, Inc.will provide geotechnical services. <br /> 2. Drill 4 borings along the proposed alignment to characterize the geotechnical conditions <br /> along the project alignment. <br /> 3. Conduct analysis to develop recommendations for the design of the pipeline and <br /> structures. <br /> 4. Provide recommended minimum distance to bridge piers for trench section. <br /> 5. Prepare a geotechnical design report summarizing the conditions encountered and the <br /> final design recommendations including dewatering recommendations and buoyancy <br /> control. <br /> Client Responsibilities <br /> 1. Provide the geotechnical engineer access to the site to conduct boring and evaluate the <br /> site conditions. <br /> 2. Client to approve geotechnical bore locations. <br /> Assumptions <br /> 1. 3 borings will be to a depth of 40 feet and one boring to a depth of 80 feet. <br /> 2. Geotechnical engineer will provide recommended bore locations with input on the <br /> alignment and structure locations provided by HDR. <br /> 3. Geotechnical borings. <br /> Deliverables <br /> 1. Draft and final geotechnical report in electronic (PDF) format. <br /> 2. Five paper copies of the final report. <br /> Task 400 — Permit Acquisition and Environmental Services <br /> Objectives <br /> City staff indicated the City would prepare the permit applications for DSO with support from <br /> HDR. Based on the selected alignment in the Predesign Phase, it was determined that wetlands <br /> would not be impacted. Consequently, no wetland delineation will be prepared. <br /> HDR Services <br /> 1. Provide assistance on an as needed basis. HDR will not perform these services unless <br /> authorized in writing by the Client. <br /> Client Responsibilities <br /> 1. Responsible for all permitting acquisition and environmental services necessary to <br /> construct the project. <br /> 2. Notify HDR of any design modifications required to acquire the necessary permits to <br /> construct the project. Design modifications may be considered Additional Services. <br /> City of Everett—DSO Modifications 1 . Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.