My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/01/27 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/01/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 10:17:23 AM
Creation date
3/9/2016 10:17:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 9 <br /> PROJECT TITLE: <br /> Amendment No. 1 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with HDR Consent Contact Person Souheil Nasr <br /> Engineering, Inc.to Provide Action Phone Number (425) 257-7210 <br /> Engineering and First Reading FOR AGENDA OF January 27,2016 <br /> Construction Management Second Reading <br /> Services for the Water Third Reading <br /> Pollution Control Facility Public Hearing <br /> Diversion Structure Zero— Initialed by: <br /> Modifications Project <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Pollution Control Professional Services Amendment No. 1 Public Works <br /> Facilities (on Smith Agreement, September 2, <br /> Island 2015 <br /> Amount Budgeted $7,800,000 <br /> Expenditure Required $821,038 Account Number(s): UP-3625 <br /> Budget Remaining $6,802,330 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This is the second phase of a two phase project for engineering design and construction services for the <br /> Water Pollution Control Facility on Smith Island. Phase 1 (pre-design) was authorized by Council on <br /> September 2, 2015. This Phase 2 (design and construction assistance) carries forward the preferred <br /> alternative from Phase 1 through construction.This project is listed in the Combined Sewer Overflow <br /> Agreed Order to be on line by December 31,2017. <br /> Previously authorized expenditures for the project include $176,632 for pre-design services. Total <br /> expenditures requested to date,including this request for final design and construction assistance, are <br /> $997,670. <br /> • <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize Mayor to sign Amendment No. 1 to the Professional Services Agreement with HDR Engineering, Inc.to <br /> Provide Engineering and Construction Management Services for the WPCF Diversion Structure Zero project in an <br /> amount not to exceed$821,038. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.