Laserfiche WebLink
4 <br /> 2 <br /> AMENDMENT NO. 1 <br /> TO <br /> AGREEMENT FOR ENGINEERING SERVICES <br /> WPCF DIVERSION STRUCTURE ZERO MODIFICATIONS PROJECT <br /> WHEREAS: <br /> HDR Engineering, Inc. (HDR) entered into an Agreement on September 2,2015 <br /> to perform engineering design and construction services for the WPCF Diversion <br /> Structure Zero Modifications Project for the City of Everett("City"); <br /> The City desires to amend this Agreement by adding to the scope of services in order to <br /> perform the final engineering design and construction services and HDR is willing to <br /> amend the agreement. <br /> NOW, THEREFORE,HDR and the City do hereby agree: <br /> The Agreement and the terms and conditions therein shall remain unchanged <br /> other than those conditions and exhibits listed below; <br /> Section 4: Modify Paragraph D,which describes the maximum total <br /> compensation,by increasing the total maximum compensation by$821,038. Delete the <br /> existing sentence and replacing with the following sentence: <br /> "Total compensation,including all services and expenses, shall not exceed a <br /> maximum of nine hundred ninety seven thousand six hundred seventy dollars <br /> ($997,670)." <br /> Amend the previous Exhibit A; Scope of Services, and Exhibit B; Project Hours, <br /> Expenses and Fee Estimate,by adding the following items: <br /> Exhibit Al; Scope of Services, and <br /> Exhibit Bl; Project hours,Expenses and Fee Estimate <br /> Pagel of 2 <br />