My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshland Flood Control District 10/11/2017 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
Marshland Flood Control District 10/11/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 9:08:06 AM
Creation date
12/14/2017 9:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshland Flood Control District
Approval Date
10/11/2017
Council Approval Date
10/11/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Jim Miller
Subject / Project Title
Hillside Runoff In Marshland Drainage Basin
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$30,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that it is appropriate to apply a peaking factor of one point six (1.6)to the straight-line percentage <br /> set forth above in order to derive an equitable percentage allocation of the total pump-related <br /> Operating Costs to the Increased Hillside Runoff. Multiplying the straight-line percentage of <br /> fourteen and fifty hundredths percent(14.50%)by the 1.6 peaking factor results in a proportionate <br /> share of twenty-three and twenty hundredths percent (23.20%). Accordingly, the appropriate <br /> proportion of the District's pump-related Operating Costs to allocate to the Increased Hillside <br /> Runoff for 2018 is twenty-three and twenty hundredths percent(23.20%). <br /> Exhibit F- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.