My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak Inc 10/30/2017 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
Otak Inc 10/30/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 9:16:48 AM
Creation date
12/14/2017 9:16:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak Inc
Approval Date
10/30/2017
Council Approval Date
10/25/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Halley Kimball
Subject / Project Title
DID 5 Downstream Dike Repair Design
Public Works WO Number
UP3652
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$409,443.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Continued <br /> horizontal scale of 1"=20 feet and a vertical scale of 1"=5 feet. Details will be prepared at an <br /> appropriate scale to illustrate the level of detail needed for clarity. The 100% civil design plans will <br /> be coordinated and submitted to the County for bidding and/or shelving purposes. <br /> Deliverables <br /> • 100% Plans, five (5) hard copies at 11"x17" size, three (3) hardcopies of full-size 22"x34"plans, <br /> and electronic file (PDF file format). <br /> • Electronic copy of CAD (AutoCAD format) files. <br /> 5.5 Preparation of 100% Technical Specifications <br /> Otak will revise the previously prepared Project Manual for the 100% design. Otak will prepare <br /> technical special provisions,bid schedule, and assemble the project construction manual based on <br /> City standard"double-sided printing" format,Project Manual will include sections for contract and <br /> general/special provisions,bid proposal, contract, and applicable appendices. It is assumed that the <br /> City will provide the front-end contract (Division 0) for Otak to assemble the Project Manual. <br /> Specifications will be based on the City's standards and CSI Standard Specifications. <br /> Deliverables <br /> • Project Construction Manual at 100-percent design, sealed by a Washington state registered PE, <br /> three (3) hard copies, and electronic file (PDF file format). <br /> 5.6 Preparation of 100% Engineer's Estimate <br /> Otak will revise the previously prepared cost estimate to indicate quantity estimates and unit <br /> construction cost data to reflect the 100%level design. Quantities will be organized into standard <br /> bid items (supplemented by additional non-standard items,if necessary) conforming to the project <br /> bid schedule. Otak will estimate quantities and develop an itemized construction cost estimate using <br /> unit costs based on experience and recent similar project bid tabs. The construction cost estimate <br /> will include appropriate contingencies to reflect the level of design complete. <br /> Deliverables <br /> • 100% Engineer's Estimate, electronic file (PDF file format). <br /> DD5 Dike Repairs and Improvements Project 8 <br /> otak <br /> K:\project\32700\32758\Contract\Phase2_Scope\Scope for Phase 2-DD5 dike repairs final_17_1010.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.