My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/11/15 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/11/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 9:54:58 AM
Creation date
12/20/2017 9:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 2 <br /> PROJECT TITLE: <br /> Amendment No. 6 with Otak, Briefing COUNCIL BILL# <br /> Inc.to extend the contract Proposed Action Originating Department Public Works <br /> term for engineering and Consent Contact Person David Voigt <br /> design services through X Action Phone Number 425-257-8983 <br /> December 31, 2019 First Reading FOR AGENDA OF November 15,2017 <br /> Second Reading <br /> Third Reading <br /> • Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA - <br /> Council President 4 <br /> Location . Preceding Action Attachments Department(s)Approval <br /> Northeast Everett Amendment No. 5 Amendment No. 6 Public Works <br /> April 17, 2013 <br /> Amount Budgeted $550,000 <br /> Expenditure Required $0 Account Number(s):UP 3398-31 <br /> Budget Remaining $125,000 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Amendment No. 6 will extend the term of the Professional Services Agreement between the City and Otak, <br /> Inc., from December 31, 2017 through—December 317209 m order to finish remaining engi eering, design <br /> and construction support services for two capital sewer projects. <br /> The Hayes Street Combined Sewer Overflow Control project construction is still in progress and will be <br /> substantially complete by the end of 2017. The Cleveland Avenue Sewer Replacement and Stormwater <br /> Separation Project design is 90%complete and is scheduled for construction during 2018 and 2019. <br /> This amendment does not change the dollar amount of the professional services agreement and related <br /> amendments. <br /> REECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 6 with Otak, Inc. to extend the contract term for engineering and <br /> design services through December 31, 2019 at no additional cost to the City. <br /> 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.