My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1480-88
>
Ordinances
>
Ordinance 1480-88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2017 11:07:00 AM
Creation date
12/28/2017 11:06:59 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1480-88
Date
5/11/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> â–ºection 5. Authorization is hereby granted for the "Public Works Director," <br /> under direction of the Mayor, to assume full and complete <br /> responsibility for conducting all tasks and doing all things to <br /> accomplish the actions authorized in this ordinance. <br /> section 6. The sum of $431,750.50 is hereby appropriated to Fund 317, "S.R. <br /> 527 and 116th Street Intersection Improvements" as follows: <br /> A. Estimated Project Costs: <br /> (1) Grant Eligible Intersection Improvements, Program 946: <br /> Preliminary Engineering <br /> (W.O. #1791) $ 35,000.00 <br /> Construction, <br /> (W.O. #2140) 238,750.50 <br /> Total Estimated Cost Program 946 $273,750.50 <br /> (2) Grant Ineligible Intersection Improvements, Program 947: <br /> Preliminary Engineering <br /> (W.O. #2041) $ 51,775.15 <br /> Construction <br /> (W.0.# 2141) 83,347.20 <br /> Right of Way Acquisition <br /> (W.O. #1890) 22,877.65 <br /> Total Estimated Cost Program 947 $158,000.00 <br /> Total Estimated Costs Fund 317 $431,750.50 <br /> B. Source of Funds: <br /> (1) Grant Eligible Intersection Improvements, Program 946: <br /> (a) Preliminary Engineering <br /> (W.O. #1791) HES $ 35,000.00 <br /> (b) Construction <br /> (W.O. #2140) HES 238,750.50 <br /> Total Estimated Funds, Program 946 $273,750.50 <br /> (2) Grant Ineligible Intersection Improvements, Program 947: <br /> (a) Preliminary Engineering <br /> (W.O. #2041) 1/2 Cent Gas Tax $ 51,775.15 <br /> (b) Construction <br /> (W.O. #2141) 1/2 Cent Gas Tax 70,347.20 <br /> Developer 13,000.00 <br /> Subtotal $ 83,347.20 <br /> (c) Right of Way Acquisition <br /> (W.O. #1890) 1/2 Cent Gas Tax $ 22,877.65 <br /> Total Estimated Funds, Program 946 $158,000.00 <br /> Total Source of Funds Fund 317 $431,750.50 <br /> C. This appropriation shall not lapse, but shall be carried forward from <br /> year to year until fully expended or the purpose has been accomplished <br /> or abandoned without the necessity of reappropriation as per R.C.W. <br /> 35.33.151. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.