My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1436-88
>
Ordinances
>
Ordinance 1436-88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2018 10:54:34 AM
Creation date
1/2/2018 10:54:19 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1436-88
Date
1/27/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> In addition, the City Council's decision imposed the following <br /> conditions: <br /> Condition 8. <br /> a. The approval of Kenilworth 1 and 5 shall include the <br /> designation on the final plat map of a green belt/open <br /> space area located immediately adjacent to the single <br /> family lots. The width of said green belt/open space <br /> shall be as follows: <br /> To be determined when the City is presented with the <br /> development of Tract A of Kenilworth 1 and Tract B of <br /> Kenilworth 5. Intensity of development will determine <br /> the width of the buffer. A guideline for the buffer <br /> (consisting of evergreen trees and plantings) width shall <br /> be 150 feet for development at 5 to 8 units per acre, and <br /> a minimum of 80 feet for development less than 5 units <br /> per acre. <br /> Conclusion: A buffer of adequate width is required by the Plat of <br /> Kenilworth Hills No. 1 and 5. <br /> 4. Access: <br /> Findings: Currently the site does not have an improved public <br /> access. There is a forty (40) foot wide public right-of-way from the <br /> end of Seaway Boulevard to the site and a sixty (60) foot wide <br /> right-of-way along the west side of the property. Additional <br /> right-of-way south of the proposal down to Seaway Boulevard will <br /> ultimately be necessary. Improvements to this undeveloped <br /> right-of-way will be necessary at the time of the property is <br /> proposed for development. Regional access to the site is provided by <br /> Seaway Boulevard which extends from 20th Avenue W. , Highway 526, and <br /> Interstate 5. Future regional access will be provided by the <br /> extension of Seaway Boulevard southward intersecting with Hwy. 526 <br /> and further south connecting with Hwy. 525. Development of this road <br /> (currently called Paine Field Boulevard) is anticipated in the next <br /> 5-10 years. No access to the site from the north is anticipated, <br /> although the potential exists for access to the north if property <br /> owners both north and south of 56th St. S.W. approve. <br /> Conclusions: Existing and planned regional access to this site is <br /> excellent for office and industrial development. Direct access can <br /> be provided to a limited degree within the existing right-of-way with <br /> partial standard street improvement. Ultimately, a fully improved <br /> industrial grade access will be required. <br /> 5. Drainage: <br /> Findings: Most of the site drains into the Powder Mill Gulch <br /> drainage basin, with a small portion on the west side draining into <br /> Edgewater Creek. Both of these drainage basins were studied in the <br /> South Everett Drainage Basins Plan and general requirements for storm <br /> water control have been identified. Each basin operates <br /> independently and ctnrm warar from nnp hasi.n cannot be transferred to <br /> another basin. On-site detention will be required for any <br /> development on this site. For development within the Powder Mill <br /> Gulch Drainage Basin, the detention volume will be based on an <br /> existing two-year storm (allowable release rate) and a 25 year <br /> developed storm. For development in Edgewater Creek Drainage Basin, <br /> detention must be sized for a 25 year developed storm and a maximum <br /> release rate to prevent the existing detention pond on Kenilworth <br /> Hill's #1 from overflowing during a 25 year storm (the maximum <br /> release rate from the existing pond is 0.5 cfs) . Surface drainage <br /> from this site must be tightlined to Powder Mill Gulch with energy <br /> dissipation provisions at the outfall. A stream buffer along Powder <br /> Mill Gulch Creek will be required in compliance with the figure on <br /> page 33 of the final EIS for the South Everett Drainage Basins Plan. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.