Laserfiche WebLink
A hydraulic project approval from the Department of Game will be <br /> required at the time of development. Grasslined swales may be <br /> required on-site to remove pollutants. Strict erosion control <br /> measures will be required during construction. <br /> Conclusions: Development of this site in conformance with the <br /> proposed office and industrial park comprehensive plan and zoning <br /> designation will result in an increase in storm water runoff and <br /> necessitating improvements to the storm drainage system. Development <br /> along any natural drainageways will have to be controlled. <br /> 6. Noise: <br /> Findings: The area does not generate any appreciable noise except <br /> for occasional vehicle trespassing on the property. It is generally <br /> just west of the final approach to the main runway for Paine Field <br /> Airport. Almost all of the site is outside the forecasted Ldn 60 <br /> noise level for the forseeable future, well below the level suggested <br /> for restriction of noise sensitive uses. However, periodically there <br /> will be aircraft operations which generate noticeable annoying short <br /> duration noise levels. Noise generated from this site under the <br /> proposed use would be required to meet State and local noise <br /> regulations. Except for the north boundary of the site, there would <br /> not be any residential or other noise sensitive uses exposed to noise <br /> generated from the site. <br /> Conclusions: This Comprehensive Plan amendment and rezone will not <br /> adversely impact surrounding areas and it will allow uses which are <br /> more compatible with the noise generated by aircraft operations from <br /> Paine Field Airport. <br /> 7. Utilities: <br /> Findings: Water service is available along Seaway Boulevard and the <br /> future alignment of 36th Avenue W. A water main across Powder Mill <br /> Gulch will be required at the time of development in an alignment <br /> approved by and meeting standards of the Public Works Department. <br /> Internal water service to City standards will be required at the time <br /> of development. Proper development of this property with the <br /> necessary water system improvements could result in improved water <br /> service to the residential area to the north. <br /> A sanitary sewer interceptor is located in Powder Mill Gulch wit <br /> sufficient capacity to serve this site and the Southwest Everett <br /> Sewer Interceptor which transports sanitary sewage from this area t <br /> the City's sewer lagoon has been sized to serve either moderat <br /> density residential areas or office and industrial park uses. Thi <br /> property is subject to a substantial financial burden under ULID No. <br /> 1 (funding for the Southwest Everett Sewer Interceptor) . Failure o <br /> this site to develop in a timely manner could result in the inabilit <br /> of private resources to pay the annual ULID costs potentiall <br /> resulting in a transfer of that burden to local utility ratepayers. <br /> An internal sewer collection system will have to be provided to City <br /> standards prior to development of the property. <br /> Electrical, natural gas and tPlernmmnnirations facilities are or can <br /> easily be provided to this site. <br /> Conclusions: All basic utilities are or can be provided to the <br /> site. Internal utility facilities and some off-site improvement- <br /> must be provided prior to development of the site. <br /> -5- <br />