Laserfiche WebLink
� � <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, � <br /> __.��,_ <br /> _.� <br /> Steve Miller <br /> Associate Engineer <br /> , <br /> � � <br />