<br /> 									ORDINANCE NO.  45a Q—Q 2
<br />      																				1
<br />						AN  ORDINANCE  creating  a  special  fund  entitled  "Hewitt,
<br />						Oakes,      and    Lombard    Railroad    Bridge    Replacement,"
<br />						Fund  391  to  accumulate  all  the  design,  right-of-way  and      		1
<br />						construction  costs  for  the  Hewitt,   Oakes,   and  Lombard
<br />						Bridge  Replacement  project,   including   bridge   approach
<br />						work and  utility  replacement  work.
<br />      				WHEREAS,   on  March   2,   1984,   the   City   of   Everett   entered   an   emergency
<br />      			agreement    with    the    consulting   engineering    firm   of    Harold    Sargent    and !
<br />      			Associates  to perform  structural  analysis  and  load  rating  for  several  bridges,
<br />      			including  Oakes  Street  Bridge  and  Hewitt  Avenue  Bridge,  for  a  total  amount  of
<br />      			$7,500;  and
<br />      				WHEREAS,  on  April  18,  1984,  the  City  of  Everett  authorized  a  supplemental
<br />    			Iagreement  with  Harold  Sargent  and  Associates  to  provide  additional  services,
<br />      			including  load  ratings  on  Lombard  and  tunnel  investigations,  for  a  total  fee
<br />    			1 of $18,300;  and
<br />      				WHEREAS,   the  final  Bridge  Rating/Load  Rating  Analysis,   as  performed  by
<br />      			Harold   Sargend,    indicated   that   the   three   (3)   bridges   in   question   have,  1
<br />      			practically  speaking,  reached  the end of  their  useful lifespan;  and
<br />      				WHEREAS,    on   October   30,    1985,    Ordinance    1811-85,    titled    "Traffic
<br />      			Engineering   Improvements"   was  passed   which  repealed  Ordinance   1036-84,   and
<br />      			budgeted preliminary  engineering  in the following programs:
<br />      				Fund  368,  Program 291,  Lombard Bridge Replacement,  $50,000
<br />       				Fund  368,  Program  297,  Hewitt Bridge Replacement,  $100,000
<br />      				Fund  368,  Program 298,  Oakes Bridge Replacement,  $50,000;  and
<br />       				WHEREAS,  on  June  2,  1987,  the  City  of  Everett  entered  an  agreement  with
<br />      			INCA  ENGINEERS,   INC. ,  to  provide  Preliminary  Engineering  for  the  replacement ;
<br />      			of  the Hewitt,  Oakes,  and  Lombard  Bridges  under  a  single contract,  since  there
<br />      			is  considerable  economy  in  performing  the  engineering  services  as  a  single )
<br />      			contract with one consulting engineering firm;  and
<br />       				WHEREAS,  it  is  anticipated  at  this  time  that  there  will  be  considerable '
<br />   			(I economy  in  having  the  construction  phase  of   the  Hewitt,   Oakes,   and  Lombard
<br />      			Bridges  performed  under  a  single  construction  contract  by  a  single  contractor;
<br />      			and