My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1388-87
>
Ordinances
>
Ordinance 1388-87
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2018 11:04:03 AM
Creation date
1/4/2018 11:04:02 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1388-87
Date
10/28/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: A special construction fund is hereby established as <br /> Fund 391, entitled "Hewitt, Oakes, and Lombard Bridge Replacement" to <br /> accumulate the design and construction costs required to design and construct <br /> the Hewitt, Oakes, and Lombard Bridge Replacements including bridge <br /> approaches, street lighting, utilities, and other necessary improvements. <br /> Section 2: Authorization is hereby given to transfer the preliminary <br /> engineering funds from the existing "Traffic Engineering Improvements," Fund <br /> 368, Programs 291, 297, and 298 to the new Fund 391, Programs 924, 925 and <br /> 926, "Hewitt, Oakes, and Lombard Bridge Replacement." <br /> Section 3: Authorization is hereby given to accumulate costs and <br /> distribute payments from Fund 391 for design and construction of the Hewitt, <br /> Oakes, and Lombard Bridge Replacements including bridge approaches, street <br /> lighting, utilities, and other necessary improvements. <br /> Section 4: Authorization is hereby granted for the "Public Works <br /> Director," under the direction of the Mayor, to assume full and complete <br /> responsibility for conducting all tasks and doing all things to accomplish the <br /> actions authorized in this ordinance. <br /> Section 5: The sum of $1,980,000 is hereby appropriated to Fund 391, <br /> "Hewitt, Oakes, and Lombard Bridge Replacements" as follows: <br /> A. Estimated Project Costs: <br /> 1. Hewitt Avenue Bridge, Program 924 <br /> Preliminary Engineering Phase (W.O. #1685) $ 125,000 <br /> Right-of-way (W.O. #2099) 10,000 <br /> Railroad Flagging (W.O. #2110) 25,000 <br /> Construction Phase (W.O. #2100) 938,267 <br /> TOTAL ESTIMATED COST: $1,098,267 <br /> 2. Oakes Avenue Bridge, Program 925 <br /> Preliminary Engineering Phase (W.O. #1687) $ 92,000 <br /> Right-of-way (W.O. #2101) 3,000 <br /> Railroad Flagging (W.O. #2111) 25,000 <br /> Construction Phase (W.O. #2102) 355,345 <br /> TOTAL ESTIMATED COST: $ 475,345 <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.