Laserfiche WebLink
ORDINANCE NO. /3 -77 <br /> AN ORDINANCE amending Ordinance No. 1325-87, "Design and <br /> Construct the Alverson Bridge Upgrade," Fund No. 384, <br /> adding funding sources for Phase II (Design). <br /> WHEREAS, on October 8, 1986, Council authorized the City Public Works <br /> Department to advertise for an engineering consultant to perform the <br /> Preliminary Study and Detail Design for the Alverson Bridge Improvement; and <br /> as a result thereof hired Sverdrup Corporation; and <br /> WHEREAS, on March 17, and April 14, 1987, the engineering consultant made <br /> a presentation to City staff and the Port of Everett, respectively, regarding <br /> findings for the Alverson Bridge; and <br /> WHEREAS, on May 26, 1987, Sverdrup completed the Preliminary Engineering <br /> Study for the Alverson Bridge; and <br /> WHEREAS, on September 1, 1987, the City of Everett entered into an <br /> agreement with the Port of Everett providing funding from the Port of Everett <br /> for the Port's share of the Alverson Bridge design cost; and <br /> WHEREAS, the State of Washington has provided funding for the State's <br /> portion of the Alverson Bridge design and right-of-way. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> �II Section 1: That Section 3 of Ordinance No. 1325-87 which reads as follows: <br /> Section 3: The tasks or actions to be performed under this Ordinance are: <br /> a. Phase I. (Program 896) <br /> { Conduct a "Preliminary Design Study" to determine the most suitable <br /> { ultimate bridge configuration. The study should include traffic, <br /> enviromental, archaeological, right of way, as well as structural <br /> considerations. <br /> b. Phase II (Program 897) <br /> Conduct the detail design for the bridge upgrade including road <br /> transitions and traffic control devices at both ends of the bridge. <br /> Conduct right of way procurement. <br /> iI <br /> c. Phase III <br /> Construct the bridge upgrade improvements. <br />