My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1386-87
>
Ordinances
>
Ordinance 1386-87
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2018 11:08:06 AM
Creation date
1/4/2018 11:08:05 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1386-87
Date
10/21/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is hereby amended to read as follows: <br /> Section 3: The tasks or actions to be performed under this Ordinance are: <br /> a. Phase I. (Program 896) <br /> Conduct a "Preliminary Design Study" tc determine the most suitable <br /> ultimate bridge configuration. The study should include traffic, <br /> enviromental, archaeological, right of way, as well as structural <br /> considerations. <br /> b. Phase II (Program 897) <br /> Conduct the detail design for the bridge upgrade including road <br /> transitions and traffic control devices at both ends of the bridge. <br /> Conduct right of way procurement. <br /> c. Phase III (Program 930) <br /> The decision to construct the improvement shall be made at a later <br /> date. <br /> Section 2: That Section 4 of Ordinance No. 1325-87, which reads as follows: <br /> Section 4: The total estimated cost of this project is $4,000,000 which <br /> includes all costs related for Phase I, II, and III as <br /> outlined in Section 3. <br /> is hereby amended to read as follows: <br /> Section 4: The total estimated cost of this project is $4,821,850 which <br /> includes all costs related for Phase I, II and III as outlined <br /> in Section 3. <br /> Section 3: That Section 5 of Ordinance No. 1325-87 which reads as follows: <br /> Section 5: The sum of $110,000 is hereby appropriated to Fund No. 384 as <br /> follows: <br /> (a) Appropriation <br /> (1) Phase I Preliminary Design Study (Program 896) $110,000 <br /> (2) Phase II To be determined at a later date <br /> (3) Phase III To be determined at a later date <br /> (b) Source of Funds <br /> (1) Phase I 1987 Overlay Fund $110,000 <br /> (2) Phase II To be determined at a later date <br /> (3) Phase III To be determined at a later date <br /> NOTE: The appropriation for Phase II and Phase III shall be made at a later <br /> date by amendment to this ordinance. Preliminary indications are that <br /> the Federal government, State and Port of Everett will share in the <br /> construction cost. <br /> -2- <br /> i I <br />
The URL can be used to link to this page
Your browser does not support the video tag.