Laserfiche WebLink
Materials �'estin� � Consul�in�, Inco .=TC <br /> Geotcchnical Engincering&Consulting•Special Lispection•Materials Tcsting•Gnvironmental Consulting ,;, <br /> M�1�Tmlex t CemaUleL��� <br /> :�lovember 17, 2016 1 �"�� <br /> �`Revised 11/21/16 V <br /> City of Everett <br /> ]Keith Alewine <br /> 3101 Cedar Street - - - - <br /> Lverett, WA 98201 � � <br /> SeY1t via emaiZ: kalewine@ci.everett wa.us ,/ G J,'" �/'� j � � / <br /> _� / � <br /> =t'�� i ' �.�� <br /> ., ,. <br /> '`• _-___.~..— <br /> Re: Final Lettcr ._ _...._.__.... <br /> __. <br /> ._...__....__. _ <br /> Riverfront Development Sanitary Sewer Station Improvements—LS33 & LS43 <br /> Vicinity of 36th & Eclipse Mill Road Everett, WA <br /> MTC Project#15B069 <br /> BLDG Permit LS#33-B1502-09&LS#33-B1502-10* <br /> Dear Mr. Alewine: <br /> Materials Testing& Consulting, Inc. (MTC)provided materials testing and special inspection services <br /> during construction of the above-referenced project. This letter is a statement declaring the actual work <br /> inspected by MTC itemized below was found to be, to the best of the inspector's knowledge, in accordance <br /> with project plans, specifications, engineer approved revisions, and the International Building Code. <br /> �'he following is the scope of inspections performed on this project: <br /> ♦ Reinforced Concrete <br /> ♦ Reinforced Masonry <br /> ♦ Structural Steel <br /> In addition, Moisture-Density Relationship testing and In-Place Densities by Nuclear Method testing were <br /> conducted. MTC found the earthwork inspected to be in accordance with project plans, specifications, and <br /> engineer revisions or approval. MTC accepts responsibility only for the specific work we inspected, and <br /> where an MTC report was generated. <br /> The results of our services were provided to the local building department for review. Only WABO <br /> Certified special inspectors were utilized to perform those specific inspections as required by the Special <br /> Inspection Agreement. Any items that were found to be in noncompliance with the approved construction <br /> documents were repaired or replaced, and re-inspected for acceptance. To the best of our knowledge, items <br /> that were observed by Materials Testing & Consulting, Inc. during continuous or part time inspections for <br /> the noted project are compliant with approved plans and specifcations. <br /> Corporatc • 777 Chrysler Drive • Burlington, WA 98233 • Phonc 360.755.1990 • Fax 360.755.1980 <br /> SW Region • 21 I8 Black Lake Blvd. S.W.• Olympia, WA 98512 . Phone 360.534,9777 . Fax 360.534.9779 <br /> NW Region • 80� Dupont St, Suite � • Bellin�ham, WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 <br /> Kitsap Region • �45] N.W. Newberry Hill Road, Suite 101 • Silvcrdale, WA 98383 . Phone 360.698.6787 • Fax 360.692.1919 <br /> Visit our website: www.mtc-inc.net <br />