Laserfiche WebLink
1Vlaterials Testing & Consulting, Inc. .iT� <br /> Geotechnical l:ngincering&Consulting�Special Inspection�Materials Testing�Environmental Consulting .> <br /> �„ �o� <br /> m.d r.�e co��n"r <br /> November 17, 2016 �' <br /> *Rc;vised 1 1/21/16 <br /> City of Everett <br /> K_eith Alewine <br /> 3 l01 Cedar Street <br /> Everett, WA 98201 � I 1 <br /> .�e1Z� VIQ E/YlCll�: kalewine�r�,ci.everctt.wa.us / � � � <br /> _ �% �;3-� ! ; , � <br /> . , <br /> �� <br /> , . <br /> i � <br /> , ._ <br /> _ <br /> Re: Final Letter � � � � � <br /> Riverfront Development Sanitary Sewer Station Improvements —LS33 & LS43 <br /> Vicinity of 36th & Eclipse Mill Road Everett, WA <br /> MTC Project#15B069 <br /> BLDG Permit LS#33-B1502-09&LS#33-B1502-10* <br /> Dear Mr. Alewine: <br /> Materials Testing& Consulting, [nc. (MTC) provided materials testing and special inspection services <br /> during construction of the above-referenced project. This letter is a statement declaring the actual work <br /> inspected by MTC itemized below was found to be, to the best of the inspector's knowledge, in accordance <br /> with project plans, specifications, engineer approved revisions, and the International Building Code. <br /> The following is the scope of inspections performed on this project: <br /> ♦ Reinforced Concrete <br /> ♦ Reinforced Masonry <br /> ♦ Structural Steel <br /> In addition, Moisture-Density Relationship testing and In-Place Densities by Nuclear Method testing were <br /> conducted. MTC found the earthwork inspected to be in accordance with project plans, specifications, and <br /> engineer revisions or approval. MTC accepts responsibility only for the specific work we inspected, and <br /> where an MTC report was generated. <br /> The results of our services were provided to the local building department for review. Only WABO <br /> Certified special inspectors were utilized to perform those specific inspeetions as required by the Special <br /> lnspection Agreement. Any items that were found to be in noncompliance with the approved construction <br /> documents were repaired or replaced, and re-inspected for acceptance. To the best of our knowledge, items <br /> that were observed by Materials Testing & Consulting, Inc. during continuous or part time inspections for <br /> the noted project are compliant with approved plans and specifications. <br /> Pa�;c 1 uf Z <br /> Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Phone 360.7�i.1990 • Pax 3G0.755.1980 <br /> SN' Region • 2118 Black Lake 131vd. S.W.• Olympia, WA 98512 • Phone 3G0.�34.9777 • Fax 360.534.9779 <br /> NW Region • 80� Dupont St, Suite � • Bcllingham, Wi1 98226 • Phone 360.647.60G1 • I�ax 360.647.R111 <br /> Kitsap Region • �4�1 N.W. Newberry Hill Road, Suite 101 • Silverdale, WA 98383 • Phone 360.698.6737 • I�ax 360.G92.I919 <br /> Visit our website: w�vw.mtc-inc.net <br />