Laserfiche WebLink
� - <br /> � PUBL/L /�f/OR/C5 <br /> . ��.,,��-� <br /> April 25, 2017 <br /> Dustin Thorlakson, Architect <br /> e-mail: dthorlakson@fhoarch.com <br /> Permit Scope: TI FOR PACKAGE HANDLING DELIVERY STATION -AMAZON CORP <br /> Owner/ Tenant: LBA/PPF INDUSTRIAL II - ASSOCIATED LLC / AMAZON CORPORATE LLC <br /> Job Address: 6611 ASSOCIATED BLVD <br /> Permit Number: B1703-007 <br /> RE: CORRECTIONS FOR BUILDING PLAN REVIEW <br /> Dear Dustin, <br /> The permit application has been examined and the submittal is incomplete. Revisions are <br /> necessary before a permit can be issued. Please provide a response letter with two sets of <br /> revised drawings, with areas of revisions clouded on the drawings. Plan review will resume <br /> when the requested information is submitted and sufficient detail and information is shown to <br /> ensure that the proposed structures will be constructed in compliance with all adopted codes. <br /> Please plan on inserting the revisions to the original plan sets at the counter. If revisions are <br /> coming directly from the blue-printer, please make arrangements with them to print two full <br /> replacement sets, once you have received comments from all departments (Public Works, <br /> Utilities, Planning, and Fire departments). Please check online at everettwa.gov/permits to see <br /> the review status of your submittal. <br /> General <br /> 1. The method of compliance with the IEBC should be identified in the project data code <br /> analysis, to include whether it is prescriptive, work area, or performance compliance. <br /> Please identify if the work is Level II or III alterations, to include whether the ceiling is <br /> remaining, light fixtures are being added or replaced, quantities, etc. There are also <br /> several forms for energy compliance which address scope of new work to determine <br /> level of compliance required by WSEC chapter 5. Please submit these forms, as <br /> referenced on the TI checklist: https://everettwa.gov/DocumentCenter/Home/View/119 <br /> Occupancy <br /> 1. Please include the occupancy load calculations in the project data on the cover sheet. <br /> The projected occupant load has significantly increased from the last approved permit <br /> B0812-010. <br /> a. Since interior drive lanes have been added to the building, the occupancy types <br /> should be amended to include S-2 vehicular use, in addition to S-1 storage, per <br /> IBC section 406, as amended by the State of Washington. This is a change of <br /> use within the occupancy, which would trigger Level III compliance and IEBC <br /> Chapters 9 and 10. <br /> b. Please summarize total occupant load count by occupancy and floor area, per <br /> IBC table 1004.1.2. <br /> c. Please include plumbing fixture calculations per IBC Chapter 29, table 2902.1, as <br /> amended by the State of Washington. <br /> 2. Please include allowable height and area calculations for the three occupancies, and <br /> indicate whether the occupancies are accessory, and whether they are separated or <br /> non-separated, per IBC section 508. <br /> 3. Please show the following on the drawings: <br /> , <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425) 257-8813• Page 1 ��% ��� <br />