Laserfiche WebLink
���� �HUTLER <br /> _■ CONSULTING � <br /> ��� <br /> _ ENGINEERS��1C. 12503 I3el-Red Road,Suite 100,Bellcvue,WA 98005*(425)450-4075*FAX(425)450-0076 <br /> 5-3-17 <br /> Dustin Thorlakson <br /> Freiheit&Ho Architects <br /> 5209 Lake Washington Blvd NE, Suite 200 <br /> Kirkland, WA 98033 <br /> Re: Amazon DSE4 <br /> Everett, WA <br /> Dustin, <br /> This permit resubmittal set of drawings includes some structural changes and additions to the work <br /> submitted for permit. The following is a list of the changes which have been clouded on the drawings: <br /> 1. The roof structure was checked for the added hvac units and reinforcing detaiis provided. <br /> 2. Most of the trench drains were removed at the request of the tenant. <br /> 3. The original section B-1.1, for the trench drain, was removed. <br /> 4. A new section B-1.1 was added to reflect the step in the ramp slab at the northern most location. <br /> Rebar was added to the ramp slab because of this step. The rebar was carried over to the southern <br /> ramp for as well. <br /> If you have any questions or need additional information,please give me a call. <br /> Sincerely, <br /> �(�, <br /> J Headland, P.E. <br /> Job #17-21 <br />