My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6611 ASSOCIATED BLVD AMAZON 2021-02-17
>
Address Records
>
ASSOCIATED BLVD
>
6611
>
AMAZON
>
6611 ASSOCIATED BLVD AMAZON 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:44:08 AM
Creation date
1/11/2018 2:04:30 PM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6611
Tenant Name
AMAZON
Notes
CORPORATE LLC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�-- <br /> , �I � t �^�,r' �- <br /> Freiheit Ho <br /> May 4, 2017 <br /> CITY OF EVERETT <br /> PUBLIC WORKS <br /> 3200 CEDAR STREET <br /> EVERETT, WA 98201 <br /> ATTN: MEG HALEY, RA <br /> RE: CORRECTIONS FOR BUILDING PLAN REVIEW - RESPONSE <br /> PERMIT NUMBER B1703-007 <br /> DSE4 - 6611 ASSOCIATED BLVD <br /> Meg: <br /> We have received and reviewed your plan check comments dated April 25, 2017 and provide the below <br /> response. Your original comments are shown in italics, our response in bold text. We have provided <br /> revised drawing sheets titled 'Permit Resubmittal #1'dated May 04, 2017 as a response to your <br /> comments. Revisions are clouded and noted with a delta 1. <br /> In addition to the addressed comments, tenant directed minor revisions have occurred that are reflected <br /> in the resubmitted drawing set. These revisions include: <br /> ✓• Eliminated the smoker's canopy <br /> ✓• Eliminated the interior trench drains <br /> �• Expanded the mechanical exhaust system <br /> ✓• Revised rooftop mechanical equipment <br /> �: Other minor revisions <br /> GENERAL <br /> 1. The method of compliance with the IEBC should be identiFed in the project data code ana/ysis, to <br /> include whether it is prescriptive, work area, o�perfo�mance compliance. Please identify if the work is <br /> Leve/II or III alterations, to inc/ude whether the ceiling is remaining, light fixtures are being added or <br /> rep/aced, quantities, etc. There are also several forms for energy compliance which address scope of <br /> new work to determine/evel of comp/iance required by WSEC Chapter S. Please submit these forms, <br /> as referenced on the TI Checklist. <br /> Response: <br /> ;�/ The applicable IEBC compliance method has been added to sheet A0.00 under Project Data. <br /> Refer to attached cover letter from Robison Engineering addressing the energy compliance <br /> forms. <br /> OCCUPANCY <br /> 1. Please include the occupancy load ca/culations in the project data on the co ver sheet The projected <br /> occupant load has significantly increased from the last approved permit B081Z-010. <br /> a. Since interior drive lanes have been added to the building, the occupancy types should be <br /> amended to inc/ude S-Z vehicu/ar use, in addition to S-1 storage, per IBC Section 406, as <br /> amended by the State of Washington. This is a change of use within the occupancy, which <br /> wou/d trigger Level III compliance and IEBC Chapters 9 and 10. <br /> 425 627 2100 425 82tl 6899 www.FHOARCH.CUM 5209 Lalre Washingron Blvd N.E. Ste 200 I<irl<land WA 9d033 <br /> � _t F,iiir„� .._. �i��i�, ��, _ , <br /> ! _ >.: !< � <br />
The URL can be used to link to this page
Your browser does not support the video tag.