My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6611 ASSOCIATED BLVD AMAZON 2021-02-17
>
Address Records
>
ASSOCIATED BLVD
>
6611
>
AMAZON
>
6611 ASSOCIATED BLVD AMAZON 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:44:08 AM
Creation date
1/11/2018 2:04:30 PM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6611
Tenant Name
AMAZON
Notes
CORPORATE LLC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> CORRECTIONS FOR BUILDING PLAN REVIEW- RESP�JNSE Page 3 ;� � <br /> PERMIT NUMBER B1703-007 `� <br /> DSE4 - 6611 ASSOCIATED BLVD - <br /> CONSTRUCTION <br /> 1. Please indude the p/ans for the existing mezzanine floor p/an and the intended use. This floor area <br /> shou/d be included in the occupancy and p/umbing fixture ca/culations requested. <br /> �✓Response: <br /> The mezzanine floor plan has been added to the drawing set for reference. Refer to new <br /> sheet A3.81. The mezzanine is included in the ciccupancy and plumbing calculations on sheet <br /> A1.00 <br /> 2. If the mezzanine is being used for storage, please p�ovide a letter that the structure has been <br /> reviewed to meet this intended maximum load by the engineer of record. <br /> a. The plans should indude the requirements for posting the allowable live load for the <br /> mezzanine in accordance with IBC 106.1 <br /> �/Response: <br /> There is no work on the existing mezzanine. Existing mezzanine is office use; office use will <br /> be maintained under new tenant. Mezzanine will not be used for storage. <br /> 3. The new suspended cei/ing details shou/d show a Z inch ang/e at the wall,per the Northwest Ceiling <br /> Bureau details on document 401. <br /> ,�Response: <br /> The suspended ceiling details have been revised to adhere to the Northwest Ceiling Bureau <br /> document 401. Refer to 17/A6.03 and 18/A6.03. <br /> ACCESSIBILITY <br /> 1. Please indicate the accessible path of travel from the warehouse storage area to the office cafeteria <br /> and restrooms, to inc/ude a cross-hatched path and level changes, where the path of travel crosses <br /> the vehicu/ar/anes of tra v% per IBC section 110�4.1 and 1106,6, as amended by the State of <br /> Washington. <br /> ,/ Response: <br /> Code Plan 1/A1.00 shows striping throughout ithe warehouse which serves as the accessible <br /> route. This path serves all areas of the warehouse, the break room, and restrooms. There are <br /> no level changes across the main floor inside the building. The accessible route serving the <br /> existing mezzanine uses the existing elevator. <br /> 2. Please identify the main ent�ance, and the accessible route from the accessible parking to the main <br /> entrance of the building. Since new parking has�yeen added, and this is a Level III change of <br /> occupancy, p/ease indicate the fol%wing on the p/ans. <br /> a. The building permit site plan shou/d indicate the/ocation of van accessible parking, width <br /> dimensions, access ais/es for accessible,c�arking, curb cuts, accessible parking signage, and <br /> identifiable accessible routes to the building served,per IBC section 1104.3, 1106.1, 1106.4, <br /> 1106.5, 1106.6, and IEBC sections 410.S and 410.7. The costs for pro viding the accessible <br /> route are not to exceed 20% of the cost of the a/terations to the primary function area, <br /> b. Accessible parking spaces shou/d be loca�ted on the shortest accessible route to the main <br /> pedestrian entrance, per IBC section 1106.6, as amended by the State of Washington. <br /> c. The tota/number of required parking spaces shou/d be summarized on the p/ans, to indude <br /> the specific number of van accessible parking spaces required, per IBC section 1106.5 and <br /> IBC table 1106.1. <br /> d. All new work on the pa�king facility, to include the requirements listed above, shou/d be <br /> dimensioned and c%arly identified on the drawings for plan review and inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.