Laserfiche WebLink
,�.��� <br /> puecic wo��rs <br /> May 8, 2017 <br /> Dustin Thorlakson, Architect <br /> e-mail: dthorlaksonCa�fhoarch.com <br /> Permit Scope: TI FOR PACKAGE HANDL.ING DELIVERY STATION -AMAZON CORP <br /> Owner/ Tenant: LBA/PPF INDUSTRIAL II - ASSOCIATED LLC / AMAZON CORPORATE LLC <br /> Job Address: 6611 ASSOCIATED BLVD <br /> Permit Number: B1703-007 <br /> RE: CORRECTIONS FOR BUILDING PLAN REVIEW <br /> Hi Dustin, <br /> Thanks for arranging the phone call with John today. These are the more detailed comments <br /> after reading through the Mech-Sum and Proj-Sum forms; thanks for e-mailing those <br /> separately. If you could print two sets of revisions and have them sent to my attention, then I <br /> will slip-sheet the drawings sets for you. Thanks! <br /> Based on our discussion, the following apply to the previous energy comments: <br /> 1. No economizer exception taken. <br /> 2. A newly conditioned warehouse requires full compliance with the energy code building <br /> envelope, including the slab edge, per WSEC C503.2. Please clarify if the prescriptive or <br /> component performance method will be used, and if component performance is used, <br /> documentation of how those components meet the requirements will be needed. <br /> a. Previous comment: Where a ch�nge in space conditioning is triggering new <br /> work, compliance with the building thermal envelope requirements should be <br /> shown in section and summarize�� on the drawings, per WSEC section C503.1. <br /> Please indicate the method of building envelope compliance by completing a total <br /> UA alternative worksheet, or pro�✓ide a completed prescriptive worksheet to <br /> include detailed R-Values of new exterior walls, roof-ceiling details, slab on grade <br /> and foundation details, per WSEC: section C402.1. <br /> b. Please summarize the information on compliance in a chart on the drawings that <br /> the inspectors can reference (preferably on the cover or code compliance sheet). <br /> 3. One option for additional energy efficiency is required for the tenant space, and a DOAS <br /> system option may be the once being considered, per WSEC C 406. <br /> a. See attached interpretation from SBCC regarding tenant space build-out. <br /> b. The DOAS system requires more documentation of controls, per WSEC section <br /> C403.6. <br /> All codes cited refer to the 2015 International Building Code (IBC), the 2015 International <br /> Existing Building Code (IEBC), the 2015 International Property Maintenance Code (IPMC), the <br /> 2015 International Fire Code (IFC), the 2015 International Mechanical Code (IMC), and the <br /> 2015 Washington State Energy Code (WSEC), as amended by the State of Washington and <br /> adopted by the City of Everett. The current IBC referenced standard for accessible design is <br /> the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). Federal ADA <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8813 • Page 1/� ;� <br />