My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6611 ASSOCIATED BLVD AMAZON 2021-02-17
>
Address Records
>
ASSOCIATED BLVD
>
6611
>
AMAZON
>
6611 ASSOCIATED BLVD AMAZON 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:44:08 AM
Creation date
1/11/2018 2:04:30 PM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6611
Tenant Name
AMAZON
Notes
CORPORATE LLC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' .'' ' ` �� �i A(� <br /> �i � � <br /> Warehouse is fully conditioned. No envelope changes made to the "building within the building" <br /> and no changes made to the plans. <br /> b. The U-value requirements for the interior windows and doors on the office/mezzanine <br /> should also be shown to be in compli,�nce with a non-conditioned space on the exterior. � <br /> Please indicate the U values of all fenestrati�n to meet energy code requirements, to include man <br /> and rolling doors, per WSEC C402.1.4 and C402.4. <br /> Warehouse is fully conditioned. No envelope changes made to the "building within the building" <br /> and no changes made to the plans. <br /> 4. Where a change in space conditioning is triggering new work, compliance with the building <br /> thermal envelope requirements should be shown in section and summarized on the drawings, per <br /> WSEC section C503.1. Please indicate the method of building envelope compliance by completing a <br /> total UA alternative worksheet, or providE� a completed prescriptive worksheet to include <br /> detailed R-Values of new exterior walls, roaf-ceiling details, slab on grade and foundation details, <br /> per WSEC section C402.1. <br /> No change in space conditioning category. W,arehouse will remain fully conditioned. No changes <br /> made to the plans. <br /> MECHANICAL <br /> 1. Deferred plan review will still require neec.net mechanical summary compliance forms, and <br /> equipment catalog cuts. <br /> Mechanical WSEC compliance forms included in the plans. See sheets M2.0 and M2.1.The following <br /> cut sheets are provided: Make-up Air units MUA-x, Unit Heaters UH-x, High Volume Low Speed Fans <br /> HVLS-x, Exhaust Fans EF-1,2. <br /> 2. The mechanical requirements for outside air should be shown on the drawings for the combined <br /> warehouse and vehicular occupancy. This may also impact the outside air requirements for the office. <br /> Ventilation calculation included in the mechanical plans.See sheet M0.1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.