Laserfiche WebLink
� � G`'r PUBL/C N/O/Z/CS <br /> ��;�y=�~�r <br /> May 8, 2017 <br /> Dustin Thorlakson, Architect <br /> e-mail: dthorlaksonCa�fhoarch,com <br /> Permit Scope: TI FOR PACKAGE HANDLIN�G DELIVERY STATION -AMAZON CORP <br /> Owner/ Tenant: LBA/PPF INDUSTRIAL II - aSSOCIATED LLC/ AMAZON CORPORATE LLC <br /> Job Address: 6611 ASSOCIATED BLVD <br /> Permit Number: B1703-007 <br /> RE: CORRECTIONS FOR BUILDING PLAN REVIEW <br /> Hi Dustin, <br /> Thanks for arranging the phone call with John today. These are the more detailed comments <br /> after reading through the Mech-Sum and Proj-Sum forms; thanks for e-mailing those <br /> separately. If you could print two sets of revisions and have them sent to my attention, then I <br /> will slip-sheet the drawings sets for you. Thanks! <br /> Based on our discussion, the following apply to the previous energy comments: <br /> 1. No economizer exception taken. <br /> 2. A newly conditioned warehouse requires full compliance with the energy code building <br /> envelope, including the slab edge, per WSEC C503.2. Please clarify if the prescriptive or <br /> component performance method will be used, and if component performance is used, <br /> documentation of how those components meet the requirements will be needed. <br /> a. Previous comment: Where a char�ge in space conditioning is triggering new <br /> work, compliance with the buildirna thermal envelope requirements should be <br /> shown in section and summarized on the drawings, per WSEC section C503.1. <br /> Please indicate the method of buiVding envelope compliance by completing a total <br /> UA alternative worksheet, or provide a completed prescriptive worksheet to <br /> include detailed R-Values of new �xterior walls, roof-ceiling details, slab on grade <br /> and foundation details, per WSEC section C402.1. <br /> b. Please summarize the informatior� on compliance in a chart on the drawings that <br /> the inspectors can reference (pre�erably on the cover or code compliance sheet). <br /> 3. One option for additional energy efficiency is required for the tenant space, and a DOAS <br /> system option may be the once being considered, per WSEC C 406. <br /> a. See attached interpretation from SBCC regarding tenant space build-out. <br /> b. The DOAS system requires more documentation of controls, per WSEC section <br /> C403.6. <br /> All codes cited refer to the 2015 International B�ilding Code (IBC), the 2015 International <br /> Existing Building Code (IEBC), the 2015 International Property Maintenance Code (IPMC), the <br /> 2015 International Fire Code (IFC), the 2015 In�ternational Mechanical Code (IMC), and the <br /> 2015 Washington State Energy Code (WSEC), as amended by the State of Washington and <br /> adopted by the City of Everett. The current IBC; referenced standard for accessible design is <br /> the 2009 "Accessible and Usable Buildings and 1=acilities" (ICC/ANSI A117.1). Federal ADA <br /> �-1 �,�� <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, 'WA 98201 • (425) 257-8813• Page 1 �M <br />