My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6611 ASSOCIATED BLVD AMAZON 2021-02-17
>
Address Records
>
ASSOCIATED BLVD
>
6611
>
AMAZON
>
6611 ASSOCIATED BLVD AMAZON 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:44:08 AM
Creation date
1/11/2018 2:04:30 PM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6611
Tenant Name
AMAZON
Notes
CORPORATE LLC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � Plan Check Comment Responses <br /> " ' Robison Engineering, Inc. <br /> 1940140th Ave.W.Suite 302 <br /> Lynnwood,Was.hington 98036 <br /> 206-364-3342 <br /> RECEIPT DATE: 05/04/2017 REVIEW DATE: 05/12/2017 <br /> PROJECT: Amazon Everett Distribution Center REI PROJECT NUMBER: 621-058 <br /> ARCHITECT: Dustin Thorlakson, Freiheit&Ho Architects, Inc REVIEWED BY: John Harrington <br /> SUBJECT: City of Everett Public Works—Correctir�ns for Building Plan Review Permit No. 61703-007 <br /> The purpose of this document is to describe revisions made to plans in response to redlined plan corrections.Corrections are <br /> noted in bold. <br /> Based on our discussion,the following apply to the previous energy comments: <br /> 1. No economizer exception taken. <br /> Correct. No changes made to the plans. <br /> 2. A newly conditioned warehouse requires full compliance with the energy code building envelope, <br /> including the slab edge, per WSEC C503.2. Please clarify if the prescriptive or component <br /> performance method will be used, and if corr�ponent performance is used, documentation of how <br /> those components meet the requirements will be needed. <br /> a. Previous comment: Where a change in s��ace conditioning is triggering new work, compliance <br /> with the building thermal envelope requirements should be shown in section and summarized on <br /> the drawings, per WSEC section C503.1. Please indicate the method of building envelope <br /> compliance by completing a total UA alternative worksheet, or provide a completed prescriptive <br /> worksheet to include detailed R-Values of new exterior walls, roof-ceiling details, slab on grade <br /> and foundation details, per WSEC section C402.1. <br /> b. Please summarize the information on compliance in a chart on the drawings that the inspectors <br /> can reference (preferably on the cover or cod� compliance sheet). <br /> Warehouse to be semi-heated. Performaince method used for envelope compliance. See <br /> updated envelope forms on Sheets M2.0, M2.1, M2.2, and M2.3. <br /> 3. One option for additional energy efficiency is required for the tenant space, and a DOAS system <br /> option may be the once being considered, per WSEC C 406. <br /> a. See attached interpretation from SBCC reg,arding tenant space build-out. <br /> b. The DOAS system requires more documentation of controls, per WSEC section C403.6. <br /> C406 option 2, reduced lighting. See sheet E6.0 for compliance changes. <br /> �3�3��,) <br /> �_ _ - <br /> , __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.