Laserfiche WebLink
a <br /> • • , <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2.R3,&R4 over 3 stories and all R1 Revised Jun 20�6 � <br /> Project Info Project Title: Amazon Delivery Station DSE4 Date O5/11/2017 <br /> Applicant Information. Provide contact inlormation for individual who can For Building Department Use <br /> Compliance forms respond to inquiries about compliance form information provided. <br /> do not require a <br /> password to use. Company Name: Robison Engineering,Inc. <br /> lnstructional and Company Address: 19401 40TH AVE W,Suite 302 <br /> calculating cells are <br /> write-protecied. Applicant Name: John Harrington <br /> Applicant Phone: 206.364.3343 <br /> Applicant Email: jharrington@robisonengineering.com <br /> Project Description ❑ New Building [� Addition �� Alteration <br /> Occupancy Type � All Commercial � Group R-All R1 and R2. R3.R4 over 3 stories 0 <br /> Selection required to enable forms. <br /> Envelope Compliance Path � prescriptive � Component Performance <br /> Selection required to enable forms. <br /> Component Performance � Standard � Change of Occupancy/Conditioning � <br /> Calculation Type <br /> Selection required to enable ENV-UA ❑ Additional Efficiency Package Option-C406.8 Enhanced Envelope <br /> and ENV-SHGC forms. To comp/y,demonstrate building thermal envelope pe�formance is 15%lower than the Target UA. <br /> � Air barrier testing per Section C402.5.1.2 [�Air barrier testing not required <br /> included in project scope <br /> Air Barrier Testing � Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> To comply,demonstrate that measured air leakage of building envelope does not exceed 0.25 <br /> cfm/ft2(air barrier surface area)under test pressure o�0.3 inch w.g. <br /> Vertical Fenestration and Total Vertical Gross Exterior <br /> Skylight Area Calculation Fenestration Above Grade %Vertical <br /> (rough opening) divided by Wall Area times 100 equals Fenestration <br /> Prescriptive Paih-Enter values lor <br /> vertical fenestration, skylights,gross 0 . 0 — 10 7 6. 0 X 1�� = 0 . 0$ <br /> walls and roof on this ENV-SUM <br /> worksheet. Gross Exterior <br /> Component Performance-Enter values Total Skylight divided by Roof Area times 100 equals %Skylight <br /> in ENV-UA and/or ENV-UA-GROUP-R <br /> worksheet. These values auto-fill from 0. 0 _ 0 . � X 1 0� — <br /> Vertical <br /> Fenestration VERTICAL FENESTRATION AREA COMPLIES <br /> Fenestration Area Compliance Area <br /> Skylight Area <br /> Vertical Fenestration � High performance fenestration U-factors and SHGC per C402.4.1.3 <br /> Alternates � Dedicated outdoor air system per C402.4.1.4 and C403.6 <br /> Show locations of qualifying daylight zone � In buildings>_3 stories,25%or more of NET floor area is in daylight zones per <br /> areas and itz on project p/ans. <br /> � In buildings<3 stories,50%or more of CONDITIONED floor area is within daylight zones per <br /> For Daylight Zone Area Calculations- C402.4.1.1 <br /> a)Sidelight areas include primary+ Daylight Zone Calculations <br /> secondary daylght zone areas. Daylight Zone Fenestration Alternate Sidelight Daylight Toplight Daylight Percent Dayiight <br /> b)Include overlapping toplight and Not Selected.No Calculations Required Zone Area Zone Area Zone Area <br /> sidelight daylight zone areas under <br /> Toplight. <br /> c)Refer to Chapter 2 for net f/oor area <br /> Spaces in Single Story List all enclosed spaces that exceed 2.500 ft2,have ceiling height greater than 15 ft,and are space <br /> Building Requiring Skylights types required to comply with this provision. <br /> Code requires a minimum of 50%of the lloor Space Area(ft2) DLZ Area(ftz) SRR or Aperature Exception <br /> area to be within a skylight day/ight zone for <br /> specific space types.Refer to C402.4.2/or <br /> requirements. <br /> DLZ=Daylight Zone. <br /> SRR=Skylight to roof ratio Indicate aperature with"AP"prefix(AP 1.1%) ' ��� <br /> �, <br />