Laserfiche WebLink
, <br /> • • Page 3 of�4� <br /> m. Exterior door U3 is not allowed to be locked from the egress side for a residential <br /> (R-2) occupancy. IBC 1008.1.9.3 (2) <br /> 4. The roof and framing plan structure for the penthouse should be shown on the <br /> drawings. Currently only a floor plan and section have been submitted. <br /> a. New work should be shown with dark lines, and existing structure should be <br /> shown with light lines. <br /> b. Glazing should be shown to be safety glazing, in vertical locations as required by <br /> IBC section 2406.4. <br /> c. The roof skylights and light-transmitting roofing should be shown to comply with <br /> IBC sections 2606, 2609, and 2610. <br /> d. The landing from the enclosed penthouse to the deck should be the same <br /> elevation as the floor on the interior of the penthouse. The landing should be <br /> shown on enlarged plans and detailed as permanent, at the same height as the <br /> floor of the penthouse enclosure, shown to meet the requirements for landing, <br /> riser, tread and handrails of IBC sections 1008.1.5, 1009.8, 1009J.2, and <br /> 1009.15. <br /> e. Wood should be shown to be pressure treated if exposed to the exterior. <br /> 5. Rainwater piping should be directed towards the roof and storm water system, and not <br /> to the interior of the roof penthouse. UPC section 1101.1 and IPMC section 304.7 <br /> 6. Please identify the source of heat in the roof penthouse, or indicate this is a semi-heated <br /> space and the method of heating. <br /> Accessibility <br /> 1. Previous comment All new door hardware to be identified on door schedule to indicate <br /> that it does not require tight grasping, tight pinching, or twisting of the wrist, per IBC <br /> section 1008.1.9.1. Please be specific if the hardware is lever, panic, or other accessible <br /> hardware. <br /> Energy <br /> 1. Previous comment. New exterior doors or building enclosure repairs should be shown to <br /> be fully compliant with the requirements of the energy code. <br /> Code references cited are the 2012 International Building Code (IBC), the 2012 Uniform <br /> Plumbing Code, and the 2012 International Property Maintenance Code (IPMC). The current <br /> IBC referenced standard for accessible design is the 2009 "Accessible and Usable Buildings and <br /> Facilities° (ICC/ANSI A117.1). <br /> This permit review does not cover Federal ADA, FHA, or HUD regulations and standards, <br /> including the Fair Housing Accessibility Guidelines. Compliance with those regulations is the <br /> responsibility of the owner of the building. All codes referenced, as adopted by the City of <br /> Everett, must include current revisions by the State of Washington. Upon submittal of the <br /> response letter and drawings, your application will be given priority and plan reviews will <br /> recommence. <br /> CITY OF EVERETT- 3200 Cedar Street- Everett, WA 98201- (424)257-8800 -Fax- (425) 257-8882 <br />