My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9506 7TH AVE SE 2018-02-23
>
Address Records
>
7TH AVE SE
>
9506
>
9506 7TH AVE SE 2018-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 8:40:33 AM
Creation date
1/16/2018 9:13:02 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solomon Christian Schao( Traffic Impact Analysis <br /> Table 1: Trip Ge�ieration �umma�y—Pt�ogosed Use <br /> [TE l,and Use Code 53�1 s�Ze Average PM Yealc-Hour <br /> Private School(K 12)Variable Dnily Tri s I.nbound Outbound Total <br /> Students 120 293 9 11 ZO <br /> Teacllers and Staff 20 329 6 1 I 17 <br /> AVERAGE— - -`—I 314 8 1 S 19 <br /> A credit for t(le trip generation of the existing church on the site llas also been calculated. The trip <br /> generation of the 19,473 church is based on the average trip generation rates for IT'� Land Use <br /> Code 560, Chucch. The trip generation ofthe existing church use is summarized in Tabie 2, <br /> Table 2: Trip Generation Sutnmary—E�istiazg Use <br /> Avet�age PM Pealc-Nour <br /> Use Size Dail Tri s Inbouud Outbound Total <br /> � I'I`G Land Use Code 56� �19,475 SF 177 � 6 11 <br /> Cl�urch <br /> The ne�v trip generation of the site is summarized in Table 3. <br /> Table 3: Trip Generation Summary--New Trip Generation <br /> Use Average P14'I Peak-Aour <br /> Uaily Tri s Inbound Outbound Total <br /> Private School 3�� g �� 19 <br /> New Use <br /> Church _1�� _5 _6 -11 <br /> Gxisting Use(being removed) _ _ <br /> NEW TRTPS I 137 3 � $ <br /> T}ie �olomon Christian School is anticipated to generate 137 new average daily trips (flDrl�} and <br /> 8 new PM pealc-how-trips.The trip generation cafculations are included in the attachments. <br /> 4. TRAFFIC MITIGATION FEES <br /> The City of Everett has a traffic arnpact fee of$2,400.00 per PM peak-11our trip. The tnitigation <br /> fees are based o�7 the trip generation calculations included in Table 3 discussed earlier in this i•eport. <br /> The development is anticipated to generate xx new PM peal�-hour trips and will therefoz-e have <br /> traffic mitigatian fees of$19,200.00. It is i►nportant to note tl�at these fees do not vest and could <br /> be higher at the time of building permit applicatio«. <br /> Gibson Traftic Consultants, Inc. July 2016 <br /> 1.I1fO�R b1L75011ti'1f{iC.CUIll 3 U rC��6��7� <br /> _,� ���` . <br /> � , <br />
The URL can be used to link to this page
Your browser does not support the video tag.