Laserfiche WebLink
a , • • <br /> October 11, 2012 <br /> — _ � <br /> Reg: Colyn residence located at: <br /> 307 80th. Place s.w. <br /> Everett, Washington 98203 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, Washington 98201 <br /> Jeff Heilman <br /> Development Technician <br /> Dear Mr. Heilman: <br /> We reviewed your plan check dated on October 2, 2012, and our response to your <br /> structural comments in numerical order is as follows: <br /> 5. Please see revised foundation plan for new thickened slab footing per new <br /> detail 6S4 <br /> ---�6. All lateral loads are dumped into the new two 3'-0" shear wall panels at <br /> South of the Bonus room. Please see lateral calculations sheet L3. <br /> �—• 10. Please see revised main floor framing. <br /> 11. Please see new deck framing on sheet S2. <br /> 14. All rebar diameter, spacing, and depth of embedment is specified per strucrural <br /> details and General Structural notes on Sheet S 1 <br /> 16. All existing foundation is tied new�foundation per Detail ] 1 S4 typical. <br /> 17. Please see plans, structural details, shear wall schedule and general structural notes. <br /> 20. Please see General.Structural Note # 21 <br /> Please feel free to give us a cal�:;if you have any questions. <br /> , <br /> � <br /> ' M A' '; <br /> Best Regards, � '_�� � ���• �, � �,'�� <br /> ,,. ,.-m � '`' ':.��. <br /> ,.� .��� �� <br /> �.�,z���";,ri <br />. .._�� <br /> aled Y Sabra.3 P.E � � <br /> , �..._ _ _ , <br /> SABCO CONSULTING ENGINEERS INC. <br /> I 1322 34r�{. DRIVE S.E. EVERETT, WASHINGTON 98208 TEL(425) 338 0342 <br />