My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
>
Address Records
>
BROADWAY
>
931
>
TEUTSCH STUDENT HOUSING
>
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 10:00:50 AM
Creation date
1/17/2018 4:21:42 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
TEUTSCH STUDENT HOUSING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sabrina Fandler <br /> From: Jane Zimmerman <br /> Sent: Thursday, July 28, 2016 10:10 AM <br /> To: Sabrina Fandler <br /> Subject: Student housing proposal at 931 N Broadway <br /> Hi Sabrina— <br /> Please see below for my review comments on the project submittals <br /> Thank you, <br /> Jane <br /> Jane Zimmerman, Sr. Engineer <br /> City of Everett Public Works Department <br /> phone: 425-257-8885 fax: 425-257-8882 <br /> e-mail:izimmerman(a�everettwa.qov <br /> REVIEW COMMENTS, 931 BROADWAY <br /> Pump related: <br /> The pump design, selection, and specification selection information must be provided in both the report and on the <br /> plans for the initial installation. If/when one of the pumps fails in the future, there must be enough information given to <br /> allow the City's inspector and the site owner to identify a suitable replacement pump. <br /> Pump calculations are required showing the determination of the total dynamic head. In addition,the system curve (the <br /> ��ump's total dynamic head versus the flow rate in the system) should be �lotted on the selected pump's characteristic <br /> curve in order to show the pump's operal:ing point. <br /> The source of power for the pump needs to be shown on the drainage plan, and the design of the electrical feed and <br /> connection must be approved as part of the building permit. <br /> If the stormwater pump fails on this site, there will be no controlled stormwater discharge from the site. For these types <br /> of situations, City policy requires a duplex pump station that has auxiliary power, including an automatic transfer switch. <br /> Emergency overflow requirements must be met in the event the pump system fails (City 2010 SWMM, Chapter 2.9 of <br /> Volume III) and must be discussed in the report. The emergency overflow location must be shown and identified on the <br /> plans. <br /> The location of the pump panel must be shown on the plans. The pump panel must have a visible and audible high-level <br /> alarm with push-to-silence switch. <br /> Storm system improvements in 10th Street (sheet C05): <br /> City standards require a minimum 12" diameter for storm drainage pipe located in the right-of-way. <br /> City standards require a catch basin at pipe junctions—the core tap shown at key note 58 does not meet City standards, <br /> which require a catch basin at pipe junctions. <br /> 1 ✓�/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.