Laserfiche WebLink
Alley runoff(sheet C05): <br /> As currently shown, the alley is sloped to drain to EvCC property to the east and a rock pad is shown at the northeast <br /> corner of the portion of the alley that will remain impervious. This proposal is unacceptable unless EvCC grants the City a <br /> formal drainage easement to drain alley runoff into EvCC property, particularly for the impervious portion of the alley. <br /> Pump notes/detail (sheet C07): <br /> Drawings specific to the pump installation on the site need to be provided. In order to reduce possible confusion, any of <br /> the more general or alternate information that typically comes on standard pump drawings. and which doesn't apply to <br /> this particular installation, should be removed or crossed-out. <br /> The notes located under the storm drainage pump specifications table should all be deleted—the City will require <br /> specific information to be provided in the report and on the plans prior to approval of the plans. <br /> The majority of the pump general notes may be deleted from sheet C07 as they guide the design of the system —and the <br /> current design shows compliance with the pump general notes, with few exceptions. However, Note 4 should be <br /> retained and changed to read "An electrical permit is required for the electrical hookup of the pump system."; Note 10 <br /> should be retained and changed to read "City of Everett" instead of"King County"; Note 15 should be retained and <br /> changed to read "A visible and audible alarm system is required for the pump system."; and Note 16 should be retained <br /> and changed to read "Pump systems are subject to City of Everett inspection". <br /> The upper left note on the cross-sectional pump detail must be changed to specify the 48-inch Type II catch basin called- <br /> out at key note 11 on sheet C05. <br /> 2 � <br />