Laserfiche WebLink
P � � <br /> PUBL/C WORKS <br /> ��� <br /> iv. The upper left note on the cross-sectional pump detail must be changed to specify <br /> the 48-inch Type II catch basin called-out at key note ll on sheet COS. <br /> `3: The comments below were generated froin this project's Traffic Reviewer. If you have any <br /> questions regarding thesc commcnts, please contact Michael I3rick with the City of Everett <br /> Public Works Department(425-257-7790 or MBrick(�a,everettwa.<=�). <br /> a. Please see redlined comments on Sheet CO2 regarding signage. <br /> b. Please see redlined comments on Sheet CO3 (that should have been written on Sheet <br /> CO3) regarding sidewalk installation and potential conflicts with existing conduit. <br /> c. On Sheet CO3, please update the plans to show a cross walk and new stop bar. Cross <br /> walk should connect center of ramps. Stop bar should be located behind cross walk with <br /> 4' spacing between edge of stripes. A companion ramp is required on the south side of <br /> lOt" St. <br /> d. On Sheet CO3, please add the note as redlined regarding the proposed pedestrian lighting <br /> system. <br /> �. On Sheet CO3, please see redlined plans and provide a design detail for the pedestrian <br /> lighting somewhere in the civil plan set. <br /> Page 4 of 4 <br />