Laserfiche WebLink
study area are summarized in Table 8-1 below for the existing and proposed conditions. Refer to <br /> Appendix A for maps of the existing and proposed surface coverages. <br /> Toble 8-1: Existirg and Prcposed Surface Caverages <br /> Rooftops Walkways Roadway/Parking Landscaping Totallmpervious <br /> (SF) (SF) (SF) (SF) (SF) <br /> Existing Site 7,523 742 4,911 1,814 - <br /> Existing ROW 0 331 5,744 719 - <br /> Total 7,523 1,073 10,655 2,533 19,251 <br /> - Proposed Site 7,814 3,645 254 3,277 - <br /> Proposed ROW 0 1,550 938 4,560 - <br /> . <br /> Total 7,814 5,195 684 7,837 13,693 <br /> The existing and proposed conditions were modeled using the Western Washington Hydrologic <br /> Model (WWHM)to ensure that there will not be an increase in runoff from the existing conditions <br /> to the proposed conditions. If the proposed conditions are not increasing the amount of runoff <br /> from the site,the project is exempt from flow control per Public Works Interim Policy#2-11. The <br /> parameters shown in Table 8-1 above were used as inputs to the model, and the resulting flow <br /> frequency results are summarized in Table 8-2 below. <br /> Table 8-2: Existing and Proposed Peak Fiunoff Rates <br /> Existing Conditions (CFS) Proposed Conditions (CFS) <br /> Site ROW Site ROW <br /> 2-year 0.143 0.079 0.127 0.041 <br /> 10-year 0.231 0.127 0.210 0.073 <br /> 25-year 0.283 0.155 0.259 0.094 <br /> 50-year 0.325 0.177 0.298 0.111 <br /> 100-year 0.369 0.201 0.341 0.130 <br /> . The proposed conditions of the project result in a significant reduction in the peak runoff rates for <br /> all storm events. These results are consistent with the fact that the proposed project is reducing <br /> the amount of impervious surface coverage in the study area by 28.9%. The full WWHM report is <br /> � included in Appendix D. <br /> Note that the proposed site was modeled with two sub-basins under the proposed conditions. <br /> The sub-basins were delineated after determining which areas could flow via gravity to the point <br /> of connection (Basin 1a), and which remaining areas would require a pumped system (Basin 1b). <br /> Basin 1a consists of the western and southern portions of the roof, and walkways along the <br /> southern side of the building. Basin 1b consists of the northern and eastern portion of the roof, <br /> the courtyard, and any drainage collected by the footing drain system. Note that no groundwater <br /> was encountered during the subsurface explorations, and it is the opinion of the project <br /> geotechnical engineer that the amount of drainage collected by the footing drain system is <br /> negligible (barring unforeseen events such as a utility break, etc.). <br /> EVCC STUDENT HOUSING-STORMWATER SITE PLAN-REVISED.DOCX 9 � <br />