Laserfiche WebLink
� � <br /> • i <br /> technological feasibility. The review authority may allow an additional twenty feet in <br /> tower height per additional provider to accommodate co-location. <br /> Staff Response: No additional wireless communication service providers are proposed at <br /> this time. This will be a condition of approval. <br /> DECISION: The proposal is APPROVED subject to the following conditions: <br /> 1. All antennas, electrical conduits, equipment cabinet and other pole mounted equipment <br /> and hardware must be a color similar to the new steel utility pole, painted dark brown, so <br /> as to blend in with the pole. <br /> 2. The wireless communication facility will be required to be removed if it is unused far a <br /> period of at least 120 days. <br /> 3. To the extent provided by law, this utility pole must be available for other <br /> communications service providers. <br /> 4. Any changes to the proposed facility require approval by the Planning Department. <br /> � �� �� � / � •� ���� <br /> Allan Giffen, Director Date <br /> Planning and Community Development Department <br /> This is an administrative decision that is appealable to the City's Land Use Hearing Examiner. <br /> An appeal must be filed with the City within 14 days of the date of this decision. If you have <br /> questions regarding this proposal or if you wish to file an appeal, please Kembra Landry, City of <br /> Everett Planning Department, at 425.257.8808. <br /> If a complete application has not been filed for a building permit or equivalent construction <br /> permit within eighteen (18) months from the approval of this decision, the permit shall be <br /> deemed terminated, unless an extension is granted. If the permittee requests an extension in <br /> writing no later than eighteen (18) months from the land use permit date, the Director may grant <br /> a six (6) month extension. <br /> INFORMATION FOR THE DEVELOPER: <br /> PUBLIC WORKS—SABRINA FANDLER 425.257.7813 <br /> 1. Construction permits, inspections, and final approvals are required for this project from City <br /> of Everett Permit Services. <br /> 2. A Public Works Permit is required for this project. Detailed drawings in accordance with <br /> City Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing landscaping, utilities, temporary construction erosion and sedimentation control, and <br /> all required improvements/restoration on private property and within the public right-of-way. <br /> Public Works Department approval of these drawings is required prior to any permits being <br /> issued. All improvements shall be completed and approved by the Public Works Inspector <br /> SPU16-011 <br /> Page 5 of 6 <br />