C. 36th Street/Friday Avenue Intersection <br /> Construct concrete curb returns and improve storm <br /> drainage at the northwest corner of the <br /> intersection of 36th Street and Friday Avenue . <br /> D. East side of Terrace Drive - 43rd Street to <br /> 44th Street . <br /> Construct new sidewalk behind existing curb and <br /> gutter. <br /> E. Grand Avenue - 3400 Block . <br /> Replace cracked sidewalk in front of 3401 Grand <br /> Avenue . <br /> F. 33rd Street/Oakes Avenue Intersection <br /> Replace approximately 130 feet of broken sidewalk <br /> on the northeast corner of 32nd Street and Oakes <br /> Avenue intersection. <br /> G. 35th Street - Wetmore to Rockefeller <br /> Construct new curbs, gutter, and sidewalks on <br /> both sides of 35th Street . <br /> H. High Street - 38th Street to 41st Street <br /> Replace broken and cracked sidewalks as needed on <br /> both sides of the street . <br /> I. 33rd Street - Lombard Avenue to Broadway <br /> Street <br /> Construct new curb and sidewalk and pave graveled <br /> parking area on the north side of 33rd Street . <br /> J. Wall Street - Bond Street to Federal Avenue <br /> Replace existing curb , gutter, and sidewalk on <br /> the north side of the street including minor <br /> street widening and landscaping . <br /> D . Riverside <br /> 1. Allocate $3 , 000 of CDBG funds for a local history <br /> of Riverside Project . <br /> 2. Allocate $54, 000 in CDBG funds and matching funds <br /> for the replacement of hazardous sidewalks throughout <br /> the Riverside Neighborhood. (Please see attached list <br /> for location of sidewalks. ) <br /> Is hereby amended to read as follows : <br /> Section 2 : Authorization is hereby given to provide for the <br /> development of contract plans , specifications and detailed <br /> cost estimates and construction required to provide the <br /> following : <br /> A. Lowell Neighborhood Improvements <br /> 1 . Allocate $20, 032.74 in CDBG funds and matching <br /> funds for the following street and drainage improvement <br /> projects : <br /> A. South 4th Avenue - Lincoln Street to 52nd <br /> Avenue . Overlay existing street with asphalt <br /> pavement $7, 000. 00. <br />