Laserfiche WebLink
7. Replace sidewalk segment in front of 2414 Baker <br /> (estimated project cost : $550) . <br /> 8. Replace sidewalk segment in front of 2524 Maple <br /> (estimated project cost : $900) . <br /> D . Port Gardner Neighborhood Improvements <br /> 1 . $1 ,000 to Council for Greater Everett for neighborhood <br /> fair share assistance for support services to Port Gardner <br /> neighborhood. <br /> 2. Terrace Drive (43rd Street to 44th Street) , concrete <br /> curb and gutter on both sides , install storm drainage <br /> system, landscaping behind curb , asphalt resurfacing <br /> (estimated project cost : $42, 500) . <br /> 3. 43rd Street ( alley west of Rucker Avenue to Grand <br /> Avenue) construct concrete curb and gutter on north side of <br /> 43rd, install storm drainage system ( estimated project <br /> cost : $14, 160) . <br /> 4. $500 to Jackson Elementary School PTA towards estimated <br /> $2, 400 playground equipment to be purchased by PTA. <br /> 5. Terrace Drive (42nd Street to 41st Street) , concrete <br /> curb and gutter on west side , install storm drainage <br /> system, asphalt resurfacing ( estimated project cost : <br /> $34, 150) . <br /> 6. 35th Street at Hoyt intersection, install flashing <br /> signal light for traffic control and pedestrian safety <br /> (estimated project cost : $8, 140) . <br /> Is hereby amended to read as follows : <br /> Section 2 : Authorization is hereby given to provide for the <br /> development of contract plans , specifications and detailed cost <br /> estimates and construction required to provide the following : <br /> A . Lowell Neighborhood Improvements <br /> 1. Allocate funds to the Council for a Greater Everett to <br /> provide support services to the Riverside Neighborhood <br /> ($1 , 000) <br /> 2. Capital Construction Projects <br /> ($82, 000) <br /> 3. Engineering and "Design of Neighborhood Improvement <br /> Projects. ($5, 771 . 27) . <br /> 4. Street and Sidewalk Improvements on the West side of <br /> 3rd Avenue (Funds to allocated - $7, 728.73) . <br /> B . Northeast Everett Neighborhood Improvements <br /> 1 . Construct sidewalk on the west side of Walnut from 9th <br /> Street to Butler ($4 , 100. ) <br />