Laserfiche WebLink
9. Southern most 200 feet of 1800 block of Chestnut <br /> adjacent to 19th - paved and curbs on both sides and <br /> sidewalk on west side . ($25, 000) . <br /> 10. Engineering and design of neighborhood improvement <br /> projects. <br /> C. Riverside Neighborhood Improvements <br /> 1 . Replace sections of sidewalk on Highland between 23rd <br /> and Everett Avenue. The following segments are suggested <br /> (estimated project cost : $8, 600) . <br /> a. Highland between 23rd and 24th (east side) . <br /> (1) 8' sidewalk replaced in front of 2302 Highland <br /> (2) 184' sidewalk replaced in front of 2305 Highland <br /> extending through 2311 and 2317 Highland <br /> (3) 58' sidewalk replaced in front of 2329 Highland <br /> b. Highland between 24th and 25th (east side) . <br /> (1) 60 ' sidewalk replaced in front of 2423 Highland <br /> (2) 50 ' sidewalk replaced in front of 2427 Highland <br /> (3) 225 ' sidewalk replaced south of 2427 to freeway <br /> fence <br /> c . Highland between 23rd and 24th (west side) . <br /> (1 ) 85 ' sidewalk replaced in front of 2306 Highland <br /> including vacant area at corner ; rest of block OK . <br /> d . Highland between 25th and 26th (west side) . <br /> (1) 260 ' sidewalk replaced in front of house by <br /> freeway (no number) . Curbs may be needed. <br /> 2. Install concrete curb and gutter and off-street parking <br /> on 24th Street from Walnut to state Street as outlined in <br /> the Garfield Park Master Plan (estimated project cost : <br /> $27,800) . <br /> 3. Replace broken sidewalk as needed on the east side of <br /> Walnut from 20th to 22nd Street (estimated project cost : <br /> $5, 000) . <br /> 4. Replace approximately 165 feet of sidewalk and <br /> construct a drainage system to intercept ground water flow <br /> on the west side of Maple from 19th Street to Victor Place <br /> (estimated project cost : $4, 700) . <br /> 5. Allocate funds to the Council for a Greater Everett to <br /> provide support services to the Riverside Neighborhood <br /> ( funds to be allocated : $1 , 000) . <br /> 6. Replace sidewalk segment in front of 2401 and 2405 <br /> Virginia (estimated project cost : $1, 100) . <br />