Laserfiche WebLink
��. �� 17. Show attic access locations on plans, <br /> 18.A previous permit B1503-047 for installation of composition shingles was not finaled. <br /> (See #2 and #3 above in reference to roof requirements) <br /> ,,Oq�,` ;._� 19. Basements, habitable attics and every sleeping room shall have at least one operable <br /> emergency escape and rescue opening. Identify egress windows on floor plans. <br /> ���;�. � 20. Provide Smoke alarm Per R314 IRC and Carbon Monoxide alarm per R315 IRC in the <br /> basement. <br /> ��J f ,-Z 21. Provide complete drawings of all proposed front, rear and both side elevations, include <br /> all dormers, fireplaces, chimneys, decks and porches. Indicate all materials used, <br /> roofing, siding etc, Note and show all roof slopes. <br /> 5,7�;y/�,-� 22. Submit revised site plan per City of Everett Residential Submittal Checklist. All items <br /> shown on checklist are required on the site plan. <br /> P�y� 3-S 23. North arrow shown on plan view is pointing to the east, please correct. <br /> Please prepare a response letter showing where each item in this <br /> correction letter is addressed on the plan set. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> G�� �- <br /> Jeff Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email: lheilman@ci.everett.wa.us <br /> 3 , <br /> S:\1Common\Clerical\JHeilman\C1507-008(4006 High St).doc � <br />