Laserfiche WebLink
ORDINANCE NO. <br /> AN ORDINANCE CREATING A SPECIAL CONSTRUCTION FUND ENTITLED "Design and <br /> onstruct the ALVERSON BRIDGE Upgrade" Fund No. 384. <br /> HEREAS, the City Council recognizes that as new development takes place along <br /> est Marine View Drive due to general Port development and anticipated Navy <br /> .resence in the area, that improvements must be made to increase the vehicular <br /> apacity of the Alverson Bridge. <br /> HEREAS, the traffic studies of the waterfront for the Navy increased traffic, <br /> :1l show that a four lane bridge is needed. <br /> HEREAS on October 8, 1986, Council authorized the Public Works Department to <br /> advertise for an engineering consultant to perform the Preliminary Engineering <br /> .tudy and Detail Design for the Alverson Bridge Improvement. <br /> OW, THEREFORE BE IT ORDAINED BY THE EVERETT CITY COUNCIL THAT: <br /> .ection 1. A special construction fund is hereby established as Fund No. <br /> 384, entitled "Design and Construct the Alverson Bridge Upgrade", <br /> to accomplish the actions authorized in Section 3 of this <br /> Ordinance. <br /> .ection 2. Authorization is hereby granted for the "Public Works Department" <br /> under the direction of the Mayor to assume full and complete <br /> responsibility for conducting all tasks to accomplish the actions <br /> authorized in Section 3 of this Ordinance. <br /> ection 3. The tasks or actions to be performed under this Ordinance are: <br /> a. Phase I. (Program 896) • <br /> Conduct a "Preliminary Design Study" to determine the most suitable <br /> ultimate bridge configuration. The study should include traffic, <br /> enviromental, archaeological, right of way, as well as structural <br /> considerations. <br /> b. Phase II (Program 897) <br /> Conduct the detail design for the bridge upgrade including road <br /> transitions and traffic control devices at both ends of the bridge. <br /> Conduct right of way procurement. <br /> c. Phase III <br /> Construct the bridge upgrade improvements. <br /> .ection 4. The total estimated cost of this project is $4,000,000 which <br /> includes all costs related for Phase I, II, and III as outlined <br /> in Section 3. <br /> .ection 5 The sum of $110,000 is hereby appropriated to Fund No. 384 as <br /> follows: <br /> (a) Appropriation <br /> (1) Phase I Preliminary Design Study (Program 896) $110,000 <br /> (2) Phase II To be determined at a later date <br /> (3) Phase III To be determined at a later date <br /> (b) Source of Funds <br /> (1) Phase I 1987 Overlay Fund $110,000 <br /> (2) Phase II To be determined at a later date <br /> (3) Phase III To be determined at a later date <br />