Laserfiche WebLink
1 facility. The Discharger shall obtain all necessary construction/operating <br /> 2 permits from the Director . The review of such plans shall in no way relieve <br /> 3 the user from the responsibility of modifying its facility as necessary to <br /> 4 produce an effluent acceptable to the Director under the provisions of this <br /> 5 ordinance. Within a reasonable time after the completion of the wastewater <br /> 6 pretreatment facility, the Discharger shall furnish its operations and <br /> 7 maintenance procedures for the Director and WDOE to review. Any subsequent <br /> 8 significant changes in the pretreatment facilities or method of operation <br /> 9 shall be reported to and be accepted by the Director and WDOE prior to the <br /> 10 Discharger 's initiation of the changes. <br /> 11 Section 7: FEES AND CHARGES. <br /> 12 Dischargers to the Municipal Sewer System shall pay charges to <br /> 13 compensate the City for the cost of administration of the pretreatment <br /> 14 program established herein in such amounts as are established by resolution <br /> 15 of the City Council. <br /> 16 These charges relate solely to the matters covered by this ordinance <br /> 17 and are separate from all other rates or charges for sewer service; provided <br /> 18 that City shall collect said charges in the same manner as all other sewer <br /> 19 utility rates and charges and penalties are collected, including but not <br /> 20 limited to the sewer lien procedures provided under Chapter 35.67 RCW. <br /> 21 Section 8: ADMINISTRATION. <br /> 22 A. Wastewater Discharges. It shall be unlawful to discharge <br /> 23 sewage, industrial wastes, or other wastes except as authorized by the <br /> 24 Director in accordance with the provisions of this ordinance, to the <br /> 25 Municipal Sewer System. <br /> 26 B. Wastewater Discharge Permit Requirements. All Significant <br /> 27 Industrial Dischargers proposing to connect to or to discharge sewage, <br /> 28 industrial wastes, and other wastes to the Municipal Sewer System shall <br /> 29 obtain a Wastewater Discharge Permit before connecting to or discharging to <br /> 30 the Municipal Sewer System. All existing Significant Industrial Dischargers <br /> 31 connected to or discharging to the Municipal Sewer System shall obtain a <br /> 32 <br /> 10 <br />