Laserfiche WebLink
• <br /> • <br /> 2. The rezone shall not be recorded for the subject property, or permits <br /> and business licenses issued for uses not allowed under the R-S or <br /> B-1 zones shall not be granted until such time as the concomitant <br /> agreement is signed by the owners of the subject property and all <br /> applicable conditions of the concomitant agreement are fulfilled <br /> and/or warranted, as appropriate, to the satisfaction of the Public <br /> Works Department and the Planning Department. Certain conditions may <br /> be deferred until building permit applications are approved. <br /> Specific conditions and the timing of their implementation will be <br /> identified in this agreement. <br /> 3. All applications for Building Permits for substantial development as <br /> determined by the City of Everett Building Official or Planning <br /> Director shall be subject to a detailed administrative site plan <br /> review process. <br /> Detailed drawings in accordance with City Design and Construction <br /> Standards shall be submitted to the Public Works Department showing <br /> site parking layout, landscaping, utilities, storm drainage, <br /> temporary construction erosion control and all required improvements <br /> in the public right-of-way. Public Works Department and Planning <br /> Department approval of these drawings is required prior to any <br /> permits being issued. All required improvements shall be completed, <br /> approved and warranted or bonded before the Occupancy Permit is <br /> issued. <br /> 4. Access <br /> a. Future development of the subject property may require <br /> improvements to El Capitan Way and Merchant Way. <br /> Improvements will include, but are not limited to, curb, <br /> gutter, sidewalk, street widening and drainage control. <br /> b. The owner is required to sign a Local Improvement District <br /> Covenant for street frontages not being improved prior to <br /> recording of the subject rezone. <br /> c. Access to Merchant Way shall be eliminated until such time as <br /> access to those streets is warranted and improvements on those <br /> streets are constructed to City standards. <br /> 5. Storm Water Drainage <br /> A detention system shall be provided which is designed to serve the <br /> entire rezone area. The maximum outflow rate of the detention <br /> facility shall not exceed the capacity of the existing 12 inch storm <br /> drain. The detention facility shall be sized to detain the runoff <br /> from a 25-year storm for the entire tributary area of the detention <br /> pond, under existing land use conditions, per City standards. The <br /> existing detention pond shall be retained and modified to incorporate' <br /> approximately elevation 416 or the equivalent storm water capacity as <br /> determined by the Public Works Department. <br /> -2- <br />