Laserfiche WebLink
Costs of improvements to the storm drainage system shall be borne by <br /> the property owners in the rezone area benefitting from the storm <br /> drainage improvements. Proportionate improvements to the storm <br /> drainage system shall be constructed prior to recording the rezone on <br /> each affected property. Easements for the storm drainage system <br /> shall be executed prior to recording the rezone on the subject <br /> property. <br /> Drainage facilities for any property not served by the existing pond <br /> shall be required as a condition of building permit approval per City <br /> Standards. <br /> 6. Noise <br /> All existing and proposed development shall comply with the City of <br /> Everett Noise Control Ordinance, Everett Municipal Code (E.M.C.) <br /> 20.08. <br /> 7. Utilities <br /> a. All existing and future developments shall connect to the <br /> sanitary sewer system at such time as it becomes available. <br /> Extension of the sewer to serve the subject property will be <br /> required at the time of review of a development or <br /> redevelopment proposal, unless the sewer has not been extended <br /> north of 94th Street S.E. and the Snohomish County Health <br /> District certifies the adequacy of the existing septic system <br /> to serve the new or expanded use. The owner may be required to <br /> participate in the cost of oversizing the sewer line from 94th <br /> Street S.E. and/or participation in other sewer system <br /> improvements through a latecomer's agreement or some other <br /> financial instrument. <br /> b. Special charges for connection to the sewer system in <br /> accordance with Ordinance 984-83 are applicable. The actual <br /> cost shall be computed by the Building Division per the <br /> ordinance in effect at the time and according to the <br /> information provided on the approved plans on the date of <br /> permit issuance. <br /> c. All development will be required to obtain City water service. <br /> d. A fire hydrant is required within 200 driving feet but not <br /> closer than 50 feet of every structure at the time of <br /> application for any building permit. <br /> e. The existing on-site water main shall be staked within an <br /> easement to the City. The easement will be submitted to the <br /> City prior to recording the rezone on the subject property. <br /> f. As-builts of storm sewer, sanitary sewer and water systems will <br /> be required to be submitted per City Design and Construction <br /> Standards and Specifications. <br /> g. All water and sewer system improvements shall be constructed to <br /> City of Everett standards. <br /> -3- <br />