My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1253-86
>
Ordinances
>
Ordinance 1253-86
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 10:03:06 AM
Creation date
1/25/2018 10:03:04 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1253-86
Date
5/14/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • I L <br /> • <br /> 1 80-13 ELECTRICAL PERMIT FEES. A fee for each electrical permit <br /> shall be paid to the Building Official as set forth herein: <br /> 2 <br /> 3 Type of Work Fee <br /> 4 Residential (service) <br /> 100 Amp Service $ 25.00 <br /> 5 101 to 200 Amp Service $ 35.00 <br /> 201 and larger Amp Service $ 45.00 <br /> 6 <br /> Altered Circuits (each) $ 25.00 (minimum: <br /> 7 <br /> Mobile Home Hookup $ 25.00 <br /> 8 <br /> Meter Move $ 30.00 <br /> 9 <br /> Low Voltage Circuits $ 30.00 <br /> 10 <br /> Temporary Service <br /> 11 1 to 125 Amp Service $ 25.00 <br /> 126 to 200 Amp Service $ 35.00 <br /> 12 <br /> Swimming Pool/Hot Tub $ 25.00 <br /> 13 <br /> Signs $ 30.00 <br /> 14 <br /> Commercial (Based upon Contract Price/Time and Materials) <br /> 15 <br /> $250 or less $ 30.00 <br /> 16 <br /> $251 to $1,000 30.00 + 3% of cost <br /> 17 <br /> over 250.00 <br /> 18 $1,001 to $5,000 47 00 + 1.5% of cost <br /> 10 over 1,000.00 <br /> 20 $5,001 to $50,000 107.00 + 1% of cost <br /> over 5,000.00 <br /> 21 $50,001 to $250,000 557 + .8% of cost <br /> 22 over 50,000.00 <br /> 23 $250,001 to $1,000,000 2157 + .6% of cost <br /> over 250,000.00 <br /> 24 $1,000,001 and above 6,657 + .4% of cost <br /> 25 over 1,000,000.00 <br /> 26 Permits for apartments or condominium complexes require one permit per <br /> building. If individual buildings do not have a separate contract price, <br /> 27 take the total contract price and divide by the number of buildings in each <br /> complex. This amount will be used as the contract price for each building <br /> 28 and then the fees would be figured accordingly to the above Commercial <br /> schedule. <br /> 29 Inspections Requested for Existing <br /> 30 Electrical Facilities $ 30.00 <br /> 31 <br /> 32 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.