My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1237-86
>
Ordinances
>
Ordinance 1237-86
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 10:51:06 AM
Creation date
1/25/2018 10:50:55 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1237-86
Date
4/9/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 32: Service Connection Transfer to New Main. <br /> 1 <br /> In the event a service connection to any premises is not connected to a <br /> 2 <br /> main in front of or immediately adjacent to the premises, then at such time <br /> 3 <br /> as a main is installed in front of or adjacent to the premises, the <br /> 4 <br /> Utilities Division may after notifying the owner thereof, transfer the <br /> 5 <br /> service connection to the new main without charge and immediately thereafter <br /> 6 <br /> remove the old service connection. The owner shall, at the same time and at <br /> 7 <br /> his expense, connect his existing piping and plumbing facilities to the new <br /> 8 <br /> service cock or meter so installed. <br /> 9 <br /> Section 33: Services for New Developments. <br /> 10 <br /> At such time as the Utilities Division or developer is installing a <br /> 11 <br /> section of distribution system piping in a new plat or subdivision, the <br /> 12 <br /> Utilities Division or developer shall, at the same time, install water <br /> 13 <br /> service piping from the main to each of the platted lots. It is the intent <br /> 14 <br /> of this section to minimize the number of "open-cuts" required in a newly <br /> 15 <br /> 16 paved street in order to provide water service to subsequently constructed <br /> homes. Similarly, for other developments requiring new mains, the developer <br /> 17 <br /> shall install the services at the time of main installation. The cost of <br /> 18 <br /> materials, labor and equipment necessary to complete the service line <br /> 19 <br /> installations to City standards shall be borne by the developer or local <br /> 20 <br /> improvement district paying for the distribution system piping. At such <br /> 21 <br /> time as a request is made for a building permit, the individual making the <br /> 22 <br /> 23 application shall deposit with the Utilities Division the sum of sixty <br /> dollars or such amount as specified in the current ordinance or resolution <br /> 24 <br /> 25 setting rates and charges for the water system, for a service connection of <br /> 26 any size which has been previously installed complete by a developer or <br /> 27 local improvement district. Such sum shall be used to complete the <br /> 28 necessary records and accounting for the new service. If a service of a <br /> 29 different size or type than that previously installed is needed, then the <br /> 30 individual requiring the new service will have to purchase the new service <br /> 31 at the standard rate then charged by the Utilities Division. If a meter <br /> 32 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.